Aamara Capital21 Oct 2026 · For internal use only

GK Energy Ltd

NSE: GKENERGY · BSE: 544525 (verify) · Solar pump & rooftop EPC, Pune
CMPRs 98
Mkt CapRs 1,989 Cr
P/E (TTM)8.8x
52W H/L239.6 / 87.2

Snapshot

Data as of 21 Oct 2026. Latest reported period: Q1 FY27 (quarter ended 30 Jun 2026, reported 7 Aug 2026). Q2 FY27 is NOT yet reported (results expected around mid-Nov 2026; trading window closed from 1 Oct 2026). Basis: this report prefers the primary-document gap-fill (FY26 Annual Report, RHP, rating letters, transcripts, shareholding pattern) wherever it conflicts with aggregator data. Labels: [Fact] = read in a primary or named source, [Est.] = our arithmetic or inference, [Analyst View] = our judgement.

Price verification [Fact]. The Rs 98.00 close on 21 Oct 2026 is verified only through the Yahoo Finance NSE series (GKENERGY.NS: open 103.88, high 104.97, low 97.79, close 98.00, volume 443,113; prior close 19 Oct Rs 103.07, -4.9%) and is consistent with Screener (Rs 98, -4.99%). It is NOT official NSE or BSE data: the NSE and BSE sites returned HTTP 403 (Akamai block) to our tools. Treat the price as a good proxy, not an exchange-certified close.
Market dataValue
CMP (21 Oct 2026, Yahoo NSE series; not exchange-official)Rs 98.00 (-4.9% to -5.0% on the day)
Market cap (Screener, ~20.28 cr shares)Rs 1,989 cr
52-week highRs 239.60 (23 Oct 2025)
52-week lowRs 87.20 (2 Apr 2026)
vs IPO price Rs 153-36% [Est.]
vs 52-week high-59% [Est.]
P/E (TTM, Screener EPS Rs 11.17)8.8x
P/E on FY26 consolidated EPS Rs 10.909.0x [Est.]
P/B (book value Rs 43.8)~2.2x
EV (mcap less consolidated net cash Rs 237.8 cr)~Rs 1,751 cr [Est.]
EV/EBITDA (TTM Rs 345.5 cr, company basis incl. other income)~5.1x [Est.] (5.2x on Screener's Rs 334 cr)
Dividend (FY26 final Rs 0.50/share)Yield ~0.5%
Listed26 Sep 2025, NSE and BSE
Index membershipNot Available: no index inclusion found in any of the seven research inputs
Shareholders (Sep 2026)58,390
Promoter holding79.20% (flat since listing); no pledge
Company overviewDetail
Legal nameGK Energy Limited (incorporated 14 Oct 2008 as GK Energy Marketers Pvt Ltd; GK Energy Pvt Ltd from 20 Jul 2024; public limited from 2 Dec 2024)
Registered officeOffice 1901, Tower A, Gokhale Business Bay, Kothrud, Pune 411038 (FY26 AR cover); earlier address Suyog Center, Gultekadi, Pune
CINL74900PN2008PLC132926 as reported by aggregators (verify on MCA)
PromotersGopal Rajaram Kabra (Chairman, MD & CEO); Mehul Ajit Shah (Whole-Time Director & COO)
CFOSunil Kamalkishor Malu
SectorDecentralised renewable EPC: solar agricultural pumps (PM-KUSUM Component B, Maharashtra Magel Tyala), rooftop solar, now BESS
Workforce1,300+ (AR) / 1,500+ (Q1 FY27 deck); only 90 direct employees at Mar 2025, rest installation partners
Own manufacturingNone. All products via OEM/ODM partners
Statutory auditorBharat J. Rughani & Co (appointed 2 Jun 2025 for five years)
Credit ratings[ICRA]BBB+ (Stable)/A2 (12 Nov 2025, first assigned); CARE BBB+ (Stable)/A2 (5 Feb 2026, first assigned); Infomerics IVR BBB (May 2025) to BBB+/A2 (Dec 2025)
GK Energy designs, buys (from outsourced makers), delivers, installs and services small solar systems for farms and households, almost entirely on government-scheme orders. Its core product is the off-grid solar irrigation pump (3, 5 and 7.5 HP) sold under PM-KUSUM Component B and Maharashtra's Magel Tyala scheme run by MSEDCL. About 99% of FY25 revenue came from government solar-pump schemes (ICRA) and about 93% from Maharashtra. FY26 revenue grew 57% (consolidated) to Rs 1,715 cr with profit after tax of Rs 204 cr, but operating cash flow was only Rs 50.4 cr (consolidated; Rs 52.9 cr standalone against standalone PAT of Rs 201 cr). The IPO (Sep 2025, Rs 464 cr) is spent, the order book has fallen from Rs 1,029 cr to Rs 541 cr, the module plant was dropped, and the stock has fallen 36% below its IPO price to about 9x earnings.

Quick Verdict Scorecard

BusinessMedium
ManagementMedium
FinancialWeak
ValuationAttractive
OverallNeutral

Financial is rated Weak on cash conversion (FY26 operating cash flow 26% of standalone PAT; five-year cumulative operating cash flow negative), not on profit growth. Valuation is Attractive on price alone (8.8x P/E, ~5.1x EV/EBITDA) but the cheapness is conditional on earnings quality that is not yet proven. Details in Tab 13.

Headline KPIs (FY26) with both reporting bases

Revenue FY26 (consolidated)Rs 1,715.3 cr+56.7% YoY. Standalone Rs 1,532.5 cr (+40%)
PAT FY26 (consolidated)Rs 204.3 cr11.9% margin. Standalone Rs 201.3 cr (+51%)
EBITDA margin FY2618.6% / 20.4%Consolidated 18.56% (company deck, Rs 318.4 cr). Company-stated standalone 20.44%. Both include other income
RoE / RoCE (Screener)37.3% / 41.4%ICRA FY25 RoCE 76%; equity base 4.2x after IPO
Reconciliation: FY26 consolidated vs standaloneConsolidatedStandaloneGap and reason
Revenue from operationsRs 1,715.28 crRs 1,532.54 crRs 182.7 cr [Fact]: third-party DCR solar-cell/module trading by wholly-owned subsidiary GK Energy Solar Pvt Ltd (revenue Rs 182.74 cr). Earlier research called this gap unexplained; the AOC-1 in the Annual Report explains it
EBITDARs 318.4 cr (18.56%) [Fact, company deck]Rs 313.18 cr (20.44%) [Fact, company deck]Rs 5.2 cr, i.e. the subsidiary earns ~2.8% EBITDA on its trading revenue [Est.]. Both figures use the company definition (PAT + interest + tax + D&A), which includes other income (Rs 9.29 cr consolidated, Rs 9.49 cr standalone); ex other income they are Rs 309.1 cr (18.0%) and Rs 303.7 cr (19.8%)
PATRs 204.30 crRs 201.27 crRs 3.02 cr subsidiary PAT (1.7% margin)
EPSRs 10.90Rs 10.74Earlier file figure Rs 10.07 is superseded
Q4 FY26 revenueRs 476.8 crRs 418.6 crSubsidiary trading
Q1 FY27 revenueRs 505.2 crRs 505.2 crSubsidiary revenue nil in Q1 FY27

Why two EBITDA margins: the 20.44% headline is a standalone number (313.18/1,532.54). The 18.56% is consolidated, diluted by low-margin trading. Screener shows operating profit of Rs 309 cr (18.0%). The gap to the company's Rs 318.4 cr is Rs 9.3 cr and equals FY26 other income (Rs 9.29 cr in the consolidated P&L): the company defines EBITDA as PAT + interest + tax + D&A, so it includes other income [Fact, Q1 FY27 deck footnote and AR]. Like for like, the company-basis margin was 18.64% in FY25 and 18.56% in FY26 (flat to slightly down), and the Screener-basis margin 18.2% and 18.0%. We use the company basis (18.6%) elsewhere unless stated. Q1 FY27 shows the same pattern: company standalone EBITDA Rs 86.1 cr (17.05%) vs Screener Rs 82.6 cr (16.4%) on identical revenue.

Q1 FY27 (Jun-26) headlineStandalone (company)Consolidated (Screener)Prior-year comparison
RevenueRs 505.19 crRs 505.19 cr+71.1% on standalone Q1 FY26 Rs 295.27 cr; +55.5% on consolidated Rs 324.79 cr
EBITDA / marginRs 86.11 cr / 17.05%Rs 82.6 cr / 16.4%Standalone 19.74% a year ago (-270 bp)
PATRs 59.67 crRs 59.65 cr+61.6% standalone; +59.9% consolidated
Systems installed24,11824,118+122.8% YoY; 109 MW commissioned
Order book: 30 Jun 2026 plus orders received after June, to 7 Aug 2026 (company deck and CEO) [Fact]Rs 541 crDown from Rs 710 cr (31 Mar 2026 plus orders to mid-May, incl. the Rs 353.89 cr award of 6 May)
Revenue (Rs cr) and EBITDA margin: FY23 standalone, FY24-FY26 consolidated 285FY23 · 6.0% 411FY24 · 13.1% 1,095FY25 · 18.6% 1,715FY26 · 18.6% Standalone FY26: 1,532.5EBITDA margin 20.44%(company-stated) FY23-FY24 Screener basis; FY25 18.6% and FY26 18.6% company basis (Screener basis 18.2% and 18.0%)

Analyst Notes

[Analyst View] Aamara Capital, 21 Oct 2026

What happened. GK Energy listed on 26 Sep 2025 at Rs 171 on NSE (issue price Rs 153), peaked at Rs 239.60 on 23 Oct 2025, and now trades at Rs 98 (Yahoo NSE series, 21 Oct 2026, down 4.9% on the day), 36% below the issue price and about 9x trailing earnings. The business did not break: FY26 revenue rose 57% (consolidated Rs 1,715 cr) and PAT 53% (Rs 204 cr), Q1 FY27 revenue was a record Rs 505 cr and installations more than doubled to 24,118 systems. What deteriorated is everything the market could see around the earnings: the order book fell from Rs 1,029 cr (Aug 2025) to Rs 541 cr (30 Jun 2026 plus orders received to 7 Aug) while FY27 guidance doubled to Rs 3,000 cr; EBITDA margin fell from 20.5% to 17.05% in two quarters (standalone); per-pump realisation fell; and the IPO cash is gone.

The October fall is unexplained. We looked for a cause and did not find one. On 21 Oct, Shakti Pumps closed at Rs 401.65 (-3.3%), Oswal Pumps at Rs 234.65 (-4.9%; another source shows -5.2%), Waaree RTL fell 9.5% and Saatvik 3.9%, so most of the day's weakness looks sector-wide [Fact]. The exchange-disclosure page shows no company-specific October filing, no bulk or block deal and no promoter sale (promoter 79.20% constant). Our searches returned no October 2026 news on the stock or on PM-KUSUM 2.0. Candidate drivers (PM-KUSUM 2.0 still not announced after management's "Q3 / September" signal; thin order book; Rs 3,000 cr guidance needing a very back-ended year; peers' margin collapse) are [Est.] and unproven. We do not assert any of them as the cause. Price path and peer moves are in Tab 12.

Earnings quality is the central issue, not growth. FY26 operating cash flow was Rs 52.9 cr standalone against standalone PAT of Rs 201.3 cr (26%); consolidated it was Rs 50.4 cr against PAT of Rs 204.3 cr (25%). Cumulative FY23 to FY26 PAT of roughly Rs 384 cr compares with cumulative consolidated operating cash flow of roughly minus Rs 68 cr. Receivables are Rs 586 cr (standalone) on Rs 1,532 cr of revenue, debtor days 140 by the company's count, with the counterparties being state agencies. The headline "net cash of Rs 240 cr" is real arithmetic (cash Rs 443 cr less borrowings Rs 203 cr) but it is not idle cash: the IPO monitoring agency (CARE) shows the Rs 322.46 cr working-capital object and the Rs 46.48 cr general-corporate-purposes object fully used and only Rs 2.01 cr unutilised; most fixed deposits (Rs 96.7 cr of the 'other bank balances' and part of the rest) are lien-marked against credit lines; and the March balance reflects year-end collections that may be timing-flattered. Q4 is 35 to 40% of annual business, so March is the seasonal peak for collections.

Concentration is close to total. ICRA puts government-scheme revenue at about 99% of FY25 revenue; CARE puts Maharashtra above 90%; the RHP shows Maharashtra at 93.12% and the largest single customer (Ecozen Solutions) at 15.13%. PM-KUSUM 1.0 has closed for new sanctions and its completion deadline was extended to 31 Mar 2027; PM-KUSUM 2.0 was announced in March 2026 but we found no formal notification. GK's own CEO said on the August call that a delay would have "slight impact" and that rooftop would be accelerated. Rooftop is only about 5% of Q1 revenue.

Governance is the second issue. The founder-chairman-CEO was paid Rs 20.99 cr in FY26 (FY25 Rs 13.43 cr; FY24 Rs 5.90 cr; FY23 Rs 0.48 cr), received a Rs 1.53 cr trademark royalty (0.1% of sales) on a trademark the company assigned to him for Rs 1 lakh on 5 Dec 2024, and lent the company Rs 91.2 cr that was repaid within the year with Rs 2.58 cr interest. His pay is 10.4% of standalone PAT against a statutory 11% cap, and the royalty will scale with sales. Auditor Bharat J. Rughani & Co charged Rs 13 lakh for the statutory audit of a Rs 1,700 cr revenue company and also signs the IPO-use certificates. A Maharashtra GST search (27 Feb to 4 Mar 2026) produced a ~Rs 7.4 cr input-tax-credit order; the independent director resigned the day before it began and the company secretary left 14 Mar. No SEBI or MCA action, no pledge and no promoter selling were found, so this is a watch-list, not a stress case.

Management's credibility is mixed. Margin guidance was met through Q4 FY26. Volume, order-flow and capex guidance were not: FY26 installs came in at 61,085 against 70,000 to 75,000 guided (a 15 to 20% miss); the Rs 1,400 cr order book promised by end-Q1 FY27 became Rs 541 cr; the 1 GW module plant "operational by September 2026" was dropped by May 2026 ("we have dropped the solar module manufacturing"). Net debt was guided to rise and instead net cash appeared. No Q3 FY26 call was held, and one investor complained on the Q4 call that management had been unavailable.

What the price assumes. At Rs 98 the market capitalisation of Rs 1,989 cr is 8.8x trailing PAT of about Rs 227 cr and ~5.1x EV/EBITDA, with a 0.5% dividend yield. Even the worst case the CEO accepted from an analyst on the May call (Rs 2,500 cr revenue and Rs 250 cr PAT; his words: "you can definitely arrive with the discussion") would put the stock at about 8x. The market is therefore pricing a material probability that earnings do not repeat, that receivables do not convert, or that scheme dependence hits FY28. That is a reasonable stance on the evidence. What is not clear is whether it is too harsh: the sector fell together, GK's FY26 numbers were audited with an unmodified opinion, and the next two dated tests (Q2 FY27 results mid-November; PM-KUSUM 2.0 notification) are close.

What would change our view. Upgrade triggers: (1) Q2 FY27 operating cash flow turning clearly positive with debtor days at or below 125; (2) order book rebuilt above about Rs 1,200 cr on a like-for-like basis with Magel Tyala Phase 6 or 7 awards; (3) formal PM-KUSUM 2.0 notification with a stand-alone pump component; (4) founder remuneration and royalty held flat in absolute terms. Downgrade triggers: operating cycle above 150 days or PBILDT margin below 12% (CARE negative triggers), a second quarter of sub-17% standalone EBITDA margin with further realisation decline, or new governance events. Our stance is in Tab 13.

Business Deep-Dive

GK Energy calls itself a "decentralised renewable energy infrastructure" EPC company. It surveys, designs, procures (from third-party OEM/ODM makers working to GK specifications and under the GK Energy brand), warehouses, installs, commissions and services small solar systems at farm and household level, on government-scheme orders. It owns no manufacturing plant. Some suppliers also compete with GK for customers (RHP risk factor).

Corporate identifiers and IPO

ItemDetail
Incorporation and renames14 Oct 2008 as GK Energy Marketers Pvt Ltd; GK Energy Pvt Ltd on 20 Jul 2024; converted to public limited GK Energy Limited on 2 Dec 2024. Bonus issue 25:1 in Dec 2024; face value Rs 2
TickersNSE: GKENERGY; BSE scrip code 544525 (per a Chola Securities URL; verify)
IPO dates and size19 to 23 Sep 2025 (RHP: bid/offer closes Tuesday 23 Sep 2025; anchor bidding 18 Sep; RHP dated 15 Sep 2025), book-built, Rs 464.26 cr: fresh issue Rs 400 cr (26,143,791 shares) plus offer for sale of 42 lakh shares (Rs 64.26 cr)
Price band and lotRs 145 to 153; lot 98 shares; allocation 50% QIB, 35% retail, 15% NII
Subscription89.62x overall; QIB 186.29x (193x ex-anchor per 5paisa)
Lead managersIIFL Capital and HDFC Bank
Pre-IPO placementRs 100 cr at Rs 153 (65,35,947 shares, 26 Aug 2025); cut the fresh issue from Rs 500 cr to Rs 400 cr
Listing26 Sep 2025. NSE open Rs 171 (+11.8%), BSE Rs 165 (+7.8%); intraday high about Rs 173.65. (One earlier file said 30 Sep 2025 and Rs 173.65; the 26 Sep NSE bulk-deal record supports 26 Sep; ICRA's own text says 25 Sep)
Objects of the issueRs 322.46 cr of net fresh proceeds for long-term working capital; Rs 46.48 cr general corporate purposes. No capex or plant in the objects
Use of proceeds [Fact]CARE monitoring agency (Jun/Jul 2026): fully used, only Rs 2.01 cr unutilised; no deviation. Issue expenses Rs 31.06 cr company share (Rs 29.05 cr paid). Rs 292.32 cr of the Rs 400 cr had been used by Q3 FY26 (13 Feb 2026 report). Company cited IPO plus pre-IPO proceeds of Rs 474.27 cr. AR CARO note [Fact]: at 31 Mar 2026 working capital Rs 322.46 cr and GCP Rs 46.49 cr were fully used; offer expenses Rs 31.06 cr of which Rs 19.99 cr used and Rs 11.07 cr unutilised (held in FDs and current accounts); the IPO Committee (13 Oct 2025, ratified by the Board 14 Nov 2025) approved tax-related payments within the scope of general corporate purposes; the Rs 100 cr pre-IPO placement was used entirely for working capital
Rating-agency constraintsHigh customer and geographic concentration, government-scheme dependence, working-capital intensity

Products and services

Product / serviceWhat it does
Solar-powered pump system (SPPS), off-grid DC, 3 / 5 / 7.5 HP (smaller HP under KUSUM)Solar PV array, controller/VFD (MPPT), submersible or surface DC pump, structure and cabling; replaces diesel or grid pump for irrigation; 5-year warranty and O&M under the scheme; remote monitoring app
Solar dual pump systemsFor local bodies (drinking water and irrigation)
Rooftop solarGrid-connected rooftop (1 kW retail under PM Surya Ghar and state-utility empanelments, small C&I, 10 MW / 1,150-site order); net-metered; 5-year O&M; scheme rate Rs 45,450 per kW incl. GST in the Aug 2026 letter of empanelment
Water storage and distributionJal Jeevan Mission EPC
Solar street and home lights; products for government agenciesSmall-ticket solar products
Trading of PV cells and modulesThird-party goods. Standalone FY26: traded goods Rs 17 cr. Subsidiary DCR cell trading Rs 182.74 cr. In H1 FY26 'other revenue from operations' was Rs 92.01 cr vs EPC Rs 636.82 cr (~12.6%)
BESS (new, Sep 2026)150 MW / 300 MWh battery storage letter of award from MSEDCL under VGF e-reverse auction; first non-solar-pump product
After-salesCustomer contact centre, remote troubleshooting, monitoring app, buffer stock for the 5-year warranty
Talked aboutHybrid grid-connected pumps with batteries; backward integration (module plant: dropped, see below)

How it is delivered (process)

Technology [Fact]. Standard PV (Mono PERC / TOPCon, DCR-compliant for subsidised schemes) plus DC pump plus MPPT controller. No proprietary IP disclosed. Patents: none found.

Facilities

FacilityLocationDetailSource / note
Head office (owned)Units A-1901 to A-1904, A-2001, A-2002, Gokhale Business Bay, Kothrud, Pune 411038Bought for Rs 62.2 cr (registered 30 Mar 2025, possession 16 May 2025). FY26 buildings net Rs 85.2 cr (gross 86.65; additions 80.8 cr)RHP pp.203/343; AR note 3. CEO on the Q4 call: bought because "for getting the bank limits, we have fixed deposits to be given. That fixed deposit has been transfer into the asset". Loans against property from Kotak, Axis and SBI of Rs 42.5 cr+
Earlier officesSuyog Center, 802/803/805, Gultekadi, PunePlus six more offices in Maharashtra being fitted outRHP
Warehouses12 in 3 states at 30 Aug 2025: Maharashtra (Washim, Parbhani, Jalna, Sambhajinagar, Beed etc.) and Haryana (Pataudi, Gurugram) plus one more stateAll rented or licensed, mostly 11-month licences at Rs 5,000 to 66,000 a month; sq ft not disclosedRHP p.210ff
Vehicles40+ ownedLogisticsRHP; Q1 FY27 deck
Module plant (dropped)Plot B-14, MIDC Tembhurni, Madha, SolapurSubsidiary acquired the 95-year leasehold (from 25 Aug 2015) for Rs 4.05 cr on 3 Sep 2025; 1 GW planned; RHP: no vendor quotations, no sanctioned loans, first manufacturing experience. Subsidiary total assets Rs 10.9 cr at 31 Mar 2026; capex Rs 4 cr onlyRHP p.47; AOC-1. One earlier file reported "25 acres" and a "cell plant"; the primary RHP/AR text describes a module plant on this plot. The acreage is not confirmed in the primary text we read
ManufacturingNoneEverything outsourced to OEM/ODM partners. Q1 FY27 deck shows manufacturing-partner locations in 8 states (Rajasthan, UP, Himachal Pradesh, Gujarat, Maharashtra, Telangana, Chhattisgarh, Haryana) and market presence in 6 states (Maharashtra, MP, UP, Rajasthan, Haryana, Chhattisgarh). CEO: module suppliers in four states (Chhattisgarh, Gujarat, UP, Kerala)Q1 FY27 presentation; Q4 call
CertificationsISO 9001:2015 (QMS), RHP p.213No BIS, ISO 14001 or 45001 found; modules sourced from MNRE ALMM / approved-list manufacturersNot a manufacturer; component compliance sits at supplier level
ExportNone. India-only government scheme businessn/an/a
Module plant dropped [Fact]. RHP and the Nov 2025 call: 1 GW module plant at MIDC Tembhurni, "operational by Sept 2026". May 2026 call: "we have dropped the solar module manufacturing. I don't want to become a, you know, follow the herd." Aug 2026: "backward integration, I'm not very clear." Earlier research files described it as "under consideration" or planned; the primary sources supersede that. Peer Shakti Pumps is building a 2.2 GW cell and module plant in Madhya Pradesh (Rs 10 cr subsidiary investment announced 13 Oct 2026), which matters because DCR and ALMM List-II (cells, from 1 Jun 2026) rules make cell supply a strategic input.

Capacity and scale [Fact]

MetricValue
Peak installation capacity15,000 systems a month (CEO, May 2026)
FY26 installations61,085 systems, 276 MW
Cumulative at 31 Mar 2026>140,000 systems, 617 MW
Cumulative at 30 Jun 2026>164,500 systems, 726 MW
Villages covered7,500+
Q1 FY27 installations24,118 systems, 109 MW
Operating statesMaharashtra (~93% of FY25 revenue), MP, Rajasthan, Haryana, UP, Chhattisgarh. RHP planned six more states; Q4 FY26 call says no immediate plans for new states
Long-term ambition1 million systems / US$1 bn business by 2030

Distribution (go-to-market) and channels, FY25 consolidated

ChannelShare of revenue
Direct-to-beneficiary (DBT) PM-KUSUM sales to farmers via nodal-agency portals83.83% FY25 (74.39% FY24; 89.02% FY23)
Dual-pump systems to local bodiesNot separately disclosed
Direct EPC ordersNot separately disclosed
Trading of cells and modulesNot separately disclosed (see Tab 4)

Marketed share claims and subsidy mechanics

Per-pump realisation observed in awards: Rs 235.92 cr for 10,000 pumps (probable GK award, see Tab 12) and Rs 353.89 cr for 15,000 pumps both work out to about Rs 2.36 lakh per pump (3/5/7.5 HP mix); Shakti's Rs 155.24 cr for 6,580 pumps gives the same rate, consistent with L1-matched pricing. The Rs 276.93 cr (incl. GST) for 10,000 pumps in the Dec 2025 award is about Rs 2.77 lakh. Official subsidy structure: 30% central plus 30% state and 40% farmer for non-NE/hill states, with central support capped at 7.5 HP and bank finance able to cover up to 30 points of the farmer share (about 10% upfront).

Segment Analysis

GK reports a single reportable segment. No segment revenue or EBITDA is disclosed. The split below is inferred from revenue-mix disclosures, order-book composition and the Annual Report revenue note. All EBITDA figures are company-level.

Revenue mix (disclosed)

ItemFY23FY24FY25FY26 (standalone)
SPPS (solar pump) EPC % of revenue90.55%91.07%99.32%n/d
PM-KUSUM DBT % of revenue89.02%74.39%83.83%DBT EPC Rs 1,425.7 cr (93.0%)
Maharashtra % of revenuen/dn/d93.12%n/d
Rooftopnilnil~0.7% (order book Rs 20 cr)Other EPC Rs 60 cr; ~5% of Q1 FY27 revenue
Traded goodsn/dn/dn/dRs 17 cr (standalone)

Segment-level view

SegmentWhat it isCustomersSize and trendMargin profile
Solar pumps (PM-KUSUM B, Magel Tyala)Turnkey off-grid DC pump systems, 3/5/7.5 HPFarmers via DBT portal; state agencies (MSEDCL, MEDA, MREDA, HREDA); local bodies~95%+ of revenue; Q1 FY27 installs +122.8% YoY but revenue +55% to +71%Pressure: realisation per pump fell; Q1 FY27 standalone EBITDA 17.05% vs 19.74%
Rooftop solar1 kW retail (MSEDCL "Smart Scheme", ULA model, funds paid directly), PM Surya Ghar ("almost cash and carry"), 10 MW / 1,150-site order, 5 MW Gujarat industrial winHouseholds, discoms, C&I~5% of Q1 FY27 revenue but ~20% of order book (about Rs 108 cr of Rs 541 cr). Aug 2026 empanelment: 100 MW, Rs 454.50 cr incl. GSTCEO: better ROCE and faster cash than government-linked receivables; margin not disclosed
Trading (cells/modules)DCR cells bought, given to an ALMM module maker, modules received back (temporary arrangement per Q2 FY26 call)Module makersSubsidiary revenue Rs 182.74 cr FY26 (H1 FY26: Rs 92 cr); nil in Q1 FY27Low: subsidiary PBT Rs 4.23 cr, PAT Rs 3.02 cr (1.7%)
EPC sub-contract work (Ecozen)Lower-margin EPC subcontracting that GK plans to deprioritiseEcozen Solutions (Rs 165.6 cr, 15.13% of FY25 revenue)Falling reliance expectedLower than core
BESS (new)150 MW / 300 MWh, MSEDCL, VGF-backed, 15 yearsMSEDCLTariff Rs 2.38 lakh per MW per month = Rs 42.84 cr a year; commissioning within 18 months of BESPACapital intensity and funding not disclosed by the company

Core EPC margin vs total

PeriodCore EPC (pumps + rooftop) EBITDA margin [Fact, company]Prior-year
H1 FY2620.20%18.96%
9M FY2620.27%18.32%
Q1 FY27 (standalone, total)17.05%19.74%

Quarterly operating metrics

QuarterSystems installedNote
Q1 FY2610,827
Q2 FY2613,675H1 FY26 total 24,502 (+50.8%). One earlier table also placed 13,675 against Q3 FY25, a likely duplication
Q3 FY2618,9099M FY26 reported 43,421 (+41%); the sum of the quarters is 43,411 (10-unit difference in sources)
Q4 FY2617,018 [Fact, Q4 call and Q1 FY27 deck]+15% on 14,797 in Q4 FY25. The four quarters sum to 60,429 against the reported FY26 total of 61,085 (656 unreconciled; FY26 less the 9M figure of 43,421 would imply 17,664). Guidance of 70,000 to 75,000 implied 27,000 to 32,000 for Q4
Q1 FY2724,118+122.76% YoY

Fastest grower and pressure points

Quarterly revenue, Rs cr (consolidated, Screener basis) 320Q3 FY25 353Q4 FY25 325Q1 FY26 404Q2 FY26 510Q3 FY26 477Q4 FY26 505Q1 FY27 Q1 FY26 to Q4 FY26 consolidated. Standalone: 295.3, 358.5, 460.2, 418.6 (sum 1,532.6)

Financials: P&L

Data-quality notes. (1) FY22 and Q1 FY25 figures were not found; the DRHP/RHP restated financials cover FY23 to FY25, so this is a four-fiscal-year view plus TTM. (2) FY23 is standalone (no subsidiary before Nov 2024). (3) FY26 audited by Bharat J. Rughani & Co, unmodified opinion, signed 13 May 2026. (4) Value Research and DSIJ tables mislabel FY23/FY25 columns; we use the order confirmed by Screener and Business Standard (FY25 revenue Rs 1,094.83 cr). (5) Rows marked Screener are rounded aggregator values; the line items for depreciation, other income, interest and PBT below were derived from Screener when the company EBITDA was thought to be Rs 309 cr and have not been restated.

Annual P&L, consolidated (Rs cr)

Rs crFY23FY24FY25FY26TTM (Jun-26)
Revenue from operations285.03411.091,094.831,715.28~1,896 [Est.]
Growth YoYn/a+44%+166%+56.7%+57% (TTM vs FY25, Screener)
Gross profitNot Available: EPC business, materials cost not split in sources; standalone FY26 COGS Rs 986.6 cr implies gross margin ~35.6% [Est.]
EBITDA, Screener basis (ex other income)17.1853.83199.69309.1~334
EBITDA margin, Screener basis6.0%13.1%18.2%18.0%~17.6%
EBITDA, company basis (PAT + interest + tax + D&A, includes other income) [Fact for FY25, FY26]n/an/a204.04318.4~345.5 [Est.]
EBITDA margin, company basisn/an/a18.64%18.56%~18.2% [Est.]
Depreciationn/a~1~1~4~4
Other incomen/a~1~4~9~11
Interestn/a~6~22~41~37
PBTn/a~48~180~274~304
PBT marginn/a11.7%16.4%16.0%16.0%
Tax raten/a25%26%25%n/a
PAT10.0836.09133.21204.30~227
PAT margin3.5%8.8%12.2%11.9%~12.0%
EPS (Rs, FV Rs 2)0.66 (pre-bonus basis)2.147.83 (7.86 in RHP)10.90 (standalone 10.74)11.17
DividendnilnilnilRs 0.50/share (~5% payout)n/a

TTM EBITDA recomputed on the company basis [Est.]: FY26 318.4 + Q1 FY27 86.1 - Q1 FY26 59.0 (consolidated, Q1 FY27 deck) = 345.5; Screener's own TTM (ex other income) is ~334. EV/EBITDA is 5.1x on the first and 5.2x on the second. TTM revenue 1,715.28 + 505.19 - 324.79 = 1,895.7. TTM PAT 204.30 + 59.65 - 37.3 = 226.7.

FY26 standalone P&L check (Rs cr) [Fact, AR 2025-26]

LineFY26 standaloneComment
Revenue from operations1,532.54DBT EPC 1,425.7 (93.0%); other EPC 60; traded goods 17 (AR note 26)
Cost of goods (COGS)986.6Gross margin ~35.6% [Est.]
Installation and project administration162.97FY25: 148.8
Other expenses (ex installation)34.3
Employee expenses28.6
EBITDA (company-stated)313.1820.44%. Reconciles exactly: revenue 1,532.54 less COGS 986.60, purchases of stock in trade 16.39, employee 28.56 and other expenses 197.29 (installation 162.97 + 34.3) = 303.70, plus other income 9.49 = 313.19. Equivalently PBT 269.93 + finance 39.53 + D&A 3.73 [Fact, AR]
Finance cost39.5Consolidated ~41
PBT269.9
Tax68.725.4% effective [Est.]
PAT201.27+51.1% YoY; EPS Rs 10.74

Last 8 quarters, consolidated (Screener) with standalone

QuarterRevenue (cons.)EBITDA (cons.)EBITDA %PAT (cons.)Rev YoYPAT YoYRev QoQPAT QoQStandalone rev / EBITDA % / PAT
Q2 FY25 (Sep-24)~303.5*n/an/a~34.3*n/an/an/an/a270.1 / n/a / 34.2
Q3 FY25 (Dec-24)3205517%37n/an/a+5%+8%n/a
Q4 FY25 (Mar-25)3536619%45n/an/a+10%+22%n/a
Q1 FY26 (Jun-25)324.857.417.7%37.3n/an/a-8%-17%295.27 / 19.74% / 36.94
Q2 FY26 (Sep-25)4047318%47~+33%~+37%+24%+27%358.5 / 20.57% (EBITDA 73.74, Q2 call) / 46.46
Q3 FY26 (Dec-25)5109519%61+59%+65%+26%+30%460.2 / 20.54% (95.19; 20.5%) / 58.8
Q4 FY26 (Mar-26)476.884.017.6%59.25+35%+32%-6.5%-3%418.6 / 20.54% / 59.05
Q1 FY27 (Jun-26)505.282.616.4%59.65+55.5%+59.9%+6%+0.7%505.2 / 17.05% (EBITDA 86.1) / 59.67

*Q2 FY25 from IPO Central, basis unstated. Q4 FY26 consolidated revenue was Rs 476.8 cr (Business Standard / Screener) vs Rs 419 cr quoted by Arthneeti (standalone). Company-quoted Q4 FY26 EBITDA: Rs 85.96 cr standalone (20.54%, Q4 call) and Rs 86.49 cr consolidated (18.14%, Q1 FY27 deck); the Screener-basis figures in the table exclude other income. Q1 FY27 detail: PBT Rs 80.26 cr (+~59%); total income Rs 508.6 cr; EPS Rs 2.94 vs 2.19; tax rate ~26%. Q2 FY26 results reported 17 Nov 2025; one alternate report cited consolidated revenue +96.7% and PAT +118%, which we could not reconcile.

Margin trend and one-time items

Earnings quality: are profits backed by cash?

No, not yet. FY26 operating cash flow Rs 52.9 cr vs standalone PAT Rs 201.3 cr (26%); consolidated Rs 50.4 cr vs Rs 204.3 cr (25%). Cumulative FY23 to FY26 PAT ~Rs 384 cr vs cumulative consolidated CFO ~minus Rs 68 cr. See Tab 6 for the full cash-flow table and working-capital days.
PAT (gold) vs operating cash flow (grey), Rs cr 10.1-14.9FY23 36.1-4.9FY24 133.2-98.6FY25 201.352.9FY26 bars standalone (AR); consolidated: PAT 204.3, CFO 50.4FY26 FY26 standalone PAT 201.3 vs CFO 52.9 (26%). FY23-FY25 consolidated (Screener CFO). Cumulative PAT 384 vs CFO -68 (consolidated basis)

Financials: Balance Sheet, Cash Flow & Ratios

Standalone balance sheet, 31 Mar 2026 (FY25 in brackets), Rs cr [Fact, AR 2025-26]

LineFY26FY25Detail
Non-current assets122.026.7PPE and intangibles 105.5; investment in subsidiary 5.0 (0.1); other financial assets 11.5 (12.6; incl. capital advances 0.1 and bank deposits over 12 months 11.4, lien-marked)
PPE (net)105.013.1Buildings net 85.2; solar power plant 0.6; office equipment and vehicles remainder
Inventory58.259.9All raw materials and components; hypothecated
Trade receivables (net)586.1360.9Net of ECL 4.7 (FY25: 1.2); gross 590.8
Cash and equivalents335.51.0Current accounts 189.4; FDs 145.3
Other bank balances107.861.7Monitoring account 11.1; FDs lien-marked 96.7
Total cash443.362.7Most FD balances are lien-marked against credit lines
Other current assets86.466.1Plus other financial assets 3.4
Total assets1,299.4583.6Current assets = 1,299.4 - 122.0 = 1,177.4
Share capital40.634.0
Other equity844.1175.1
Equity884.6209.1
Borrowings202.7217.8Non-current 15.3 (12.4); current 187.4 (205.4)
of which purchase-bill discounting164.785.5
of which current maturities of term debt14.02.4
of which related-party loans8.60.4Promoter-family unsecured loans (see Tab 7)
FY25-only itemsnilNCDs 24.8 (14.25%, repaid); NBFC loans 18.9; unsecured bank loans 12.7
Trade payables134.9117.3MSME 8.0; others 126.9; all under 1 year except 0.7
Other financial liabilities63.131.4Mostly expense accruals 63.0
Provisions / other current liabilities9.2 / 4.5n/d
Total current liabilities399.1361.4

Receivables ageing, 31 Mar 2026 (standalone, gross Rs 590.8 cr)

BucketRs crShare
Under 6 months577.697.8%
6 to 12 months7.61.3%
1 to 2 years1.00.2%
2 to 3 years2.90.5%
Over 3 years1.70.3%

[Est.] Ageing is by invoice date with FIFO receipts, so the 'recent' bucket is flattered. Debtor days 140 (company) up from 120. The ECL provision Rs 4.7 cr is 0.8% of gross receivables.

Net cash, with caveats

BasisCashBorrowingsNet cash
Standalone (matches management Rs 240 cr; Q1 deck shows 2,406 mn)443.3202.7240.6
Consolidated443.3205.5237.8
Read-through [Analyst View]. The IPO money is spent (only Rs 2.01 cr unutilised per the CARE monitoring agency). The Mar-26 cash is mostly year-end receivable collections plus lien-marked deposits that back credit lines, not idle surplus. One earlier file linked the closing cash of Rs 335.48 cr to the IPO; that is superseded. Jun-26 net cash is Not Available (quarterly balance sheet not read).

Consolidated balance sheet history (Rs cr, 31 March)

Rs crFY23FY24FY25FY26
Equity capitaln/a13441
Net worth19.8755.96209.09~888 (41 + 847)
Total borrowings42.6162.29217.79~206 (205.5)
Other liabilitiesn/a96157212
Total assets142.82214.08583.62~1,305
Fixed assets (net)n/a1114110
Goodwill / CWIP / investmentsnilnilnilnil
Receivables112.64151.92360.85~590 (derived)
Inventory11.9119.7659.94~58-70
Net debt / (net cash)n/an/anet debt ~155 [Est.: 217.8 less 62.7](237.8) net cash

Net worth rose 4.2x in FY26 (Rs 209 cr to ~Rs 888 cr) from the Rs 400 cr fresh issue, the Rs 100 cr pre-IPO placement and Rs 204 cr of PAT. Fixed assets rose 8x because of the ~Rs 62 cr (Rs 85 cr booked) head-office purchase. CEO described ~Rs 90 cr spent on the corporate office, bought as collateral. Contingent liabilities and capital commitments are below.

Cash flow vs PAT

Rs crFY23FY24FY25FY26
PAT10.136.1133.2204.3 (standalone 201.3)
Operating cash flow-14.9-4.9-98.6+50.4 consolidated (AR p.192; Screener ~50); +52.9 standalone (AR p.140)
CFO / PATnegativenegative-74%24.7% consolidated; 26.3% standalone
Investing cash flown/a-10-53-136
Financing cash flown/a+15+152+420
Net cash flown/a00+334
Capexn/a~5~495.4 (AR); Screener approx ~99
FCFn/a-10-103-42.5 (AR: 52.9 - 95.4); Screener -49
FY26 detail (AR)IPO and pre-IPO proceeds Rs 474.3 cr; taxes paid Rs 63.2 cr; working-capital build Rs 191 cr
Cash-flow vs profit divergence. Cumulative FY23-FY26 PAT ~Rs 384 cr vs cumulative consolidated CFO ~minus Rs 68 cr. FY26 was the first positive CFO year (25% of consolidated PAT, 26% of standalone). FY25 working-capital build was Rs 249 cr. The FY26 cash pile was funded by equity (financing +Rs 420 cr), not operations. FCF yield: FY26 FCF minus Rs 42.5 cr (AR basis) over market cap Rs 1,989 cr = minus 2.1% (Screener basis minus 2.5%); FY25 FCF minus Rs 103 cr over the IPO-time market cap of ~Rs 3,100 cr = minus 3.3%; no year of positive FCF. CARE: "Cash flow from operations stood negative in FY25."

Working-capital days

DaysFY24FY25FY26 (consolidated, Screener)FY26 (company, standalone)
Debtor days135120125140
Inventory days23311821
Creditor days78614249
Cash conversion cycle8091102n/d
Working-capital days404472 (company consolidated NWC days: 101)112 (NWC days)

FY23 debtor days 144 (RHP). H1 FY26 receivable days 181. Debtor days moved 135 to 192 between Sep-24 and Sep-25 per the Nov 2025 call. ICRA FY25: receivable days ~120, NWC/OI 31% (guided 30 to 35% for FY26). FY25 trade receivables Rs 360.85 cr = 32.96% of revenue. A governance-file extract instead stated "receivables about 92% of FY25 sales" and working-capital days rising "from 54.6 to 79.8"; these conflict with the 32.96% and 44-day figures here, probably use a different base, and are carried as unreconciled. CCC lengthened because suppliers are being paid faster (creditor days 78 to 42) while debtor days stay above 120. GST order item 2 (ITC reversal on creditors outstanding more than 180 days, Rs 1.65 cr) is hard to square with 'no overdue creditors'.

Ratios

RatioFY24FY25FY26
ROE (Screener)n/a63.7% on net-worth basis (RHP) / ~25.8% (MarketsMojo average)37% (3-year average 51%)
ROCE74% (ICRA FY24: 60%)41% (ICRA FY25: 76%)41.4%
Debt / equity1.111.04~0.23
Interest coverage (EBIT / interest)~8.8x~9.0x (ICRA 8.96x; 7.4x on MarketsMojo EBIT basis)~7.4x
Net debt / EBITDAn/a~1.1xnet cash
Asset turns (revenue / average assets)n/a~2.7x~1.8x
Current ratioNot disclosed in accessible sources. On the FY26 standalone balance sheet above, current assets 1,177.4 / current liabilities 399.1 = ~2.95x [Est.]
ICRA DSCR / TOL-TNWFY25 DSCR 4.3x; TOL/TNW 1.8x (2.8x prior), expected below 0.6x in FY26 post equity

ROE definitions differ (RHP 63.7% FY25 on net worth; Value Research peer table 21.9%). The equity base ballooned in FY26, so FY27 ROE will dilute to roughly 25 to 30% on guidance [Est.].

Debt structure and lenders [Fact, AR notes 14 and 20; RHP p.343]

TypeLenderRate / terms
Term, vehicle, LAPBank of Baroda (incl. ECLGS)9.25%, 44 months
Term, vehicle, LAPHDFC Bank8.91 to 9.1%
Term, vehicle, LAPKotak Mahindra Bank8.91%
Term, vehicle, LAPAxis Bank8.25%
Term / LAP overdraftState Bank of India10.9% (per RHP)
Working capitalBank of BarodaBRLLR + 0.85%
Working capitalIndian Overseas BankMCLR + 1.15% (Rs 40 cr cash credit per RHP)
Working capitalICICI Bank6M MCLR + 0.70%
Working capitalHDFC Bank9.10% (Rs 25 cr)
Working capitalIndusInd BankRepo + 2.75%
Closed by 31 Mar 2026Equentia Financial Services; Shriram Finance; Unity Small Finance Bank13.05%; 13.5%; 11.7%
Also in RHPOxyzo Financial (Rs 10 cr, 14.2%); Mahesh Sahakari Bank (Rs 13 cr overdraft for subsidiary, 10%)n/a
Security and guaranteesSpecified immovable assets, FDs, vehicles; personal guarantees of two directors on several term loans; all working-capital lines carry the promoters' personal guarantees

Credit ratings (full text read for ICRA and CARE)

AgencyDateRatingDetail
Infomerics20 May 2025; upgrade 12 Dec 2025IVR BBB/Stable, then BBB+/Stable, A2Pre-IPO rating, upgraded; letter not read
ICRA12 Nov 2025 (letter 11 Nov)[ICRA]BBB+ (Stable) / A2 on Rs 300 cr working-capital linesFirst-time 'Assigned'. FY25 DSCR 4.3x, interest cover 8.9x, TOL/TNW 1.8x, ROCE 76%, receivable days ~120, NWC/OI 31%; liquidity adequate (IPO funds ~Rs 300 cr, fund-based lines Rs 119 cr 50% used, PBD/TREDS ~Rs 150 cr). Downgrade triggers: working-capital deterioration, policy changes, debt-funded capex
CARE5 Feb 2026CARE BBB+; Stable / A2 on Rs 235 cr LT/ST plus A2 on Rs 65 cr STFirst-time 'Assigned' (the company's exchange filing title says 'upgradation', which is loose wording). Negative triggers: PBILDT margin below 12%, TOL/TNW above 2x, operating cycle above 150 days, unplanned debt-funded capex. Fund-based utilisation ~82% and non-fund-based ~91% (12 months to Dec 2025). Payments come within 60 days of installation and inspection from MSEDCL etc.; over 90% of FY25 revenue from Maharashtra
CRISIL / IND-Ran/aNot AvailableNo rating found
Other entity2022 to 2024CARE rating exists for 'GK Energy Marketers Pvt Ltd'Relationship to the listed company to be checked

Contingent liabilities (31 Mar 2026, Rs cr; FY25 in brackets) [Fact, AR note 33]

ItemFY26FY25
GST5.240.35
Bank guarantees (performance / EMD)99.3855.65
Other matters0.17nil
Corporate guarantee to wholly-owned subsidiary13.0nil
Total117.7956.0
Capital commitmentsnilnil

Equity dilution and share count

EventDetail
Pre-IPO share count~17.0 cr shares (Mar-25 equity capital Rs 34 cr at FV Rs 2)
Bonus25:1 in Dec 2024
Pre-IPO placement (26 Aug 2025)65,35,947 shares at Rs 153 = Rs 100 cr (valuation ~Rs 3,100 cr; 3.70% of pre-offer capital)
IPO fresh issueRs 400 cr, 26,143,791 shares = 12.9% of the ~20.28 cr post-issue share count [Est.] (about 15% on the pre-issue count, which is the base some research files used)
OFS42 lakh shares (Gopal Kabra 40 lakh, Mehul Shah 2 lakh), Rs 64.26 cr, no dilution
Post-issue~20.28 cr shares; equity capital Rs 34 cr to Rs 40.6 cr; ~19% cumulative increase from the ~17.0 cr pre-IPO count [Est.]
ESOPsNone (RHP: no employee stock option plan; Sep 2026 declaration: no ESOPs, convertibles, warrants or pledges)
QIP / preferential / warrantsNone found
BuybackNone
DividendFirst-ever final dividend Rs 0.50/share (25% of FV), record date 24 Aug 2026, AGM 31 Aug 2026 (some aggregators show Rs 0.25 or Rs 1; the company filing says Rs 0.50). ~5% payout [Est.]
Lock-insPromoter locked-in shares 4,08,51,937 (20.1% of capital; minimum 18 months, ends ~Mar 2027, a potential overhang). Anchors: 50% ended 24 Oct 2025, balance 24 Dec 2025 (stock ~Rs 151.85, ~2% of equity). A 6-month expiry on 24 Mar 2026 released about 65% of equity per one low-reliability market-news site

Key balance-sheet risks

Management, Promoters & Governance

Promoters

PromoterRoleBackgroundHolding
Gopal Rajaram Kabra (DIN 02343128)Chairman, MD and CEO. MD since 2 Dec 2024. With the company since 2008B.Com (Swami Ramanand Teerth Marathwada University); MBA Marketing (Vishwakarma School of Business Management and Research). Business family from Nanded, educated in Pune. Entered renewables via solar water heaters in 2006; over 20 years in solar. Udyog Ratan Award 2013. Partner in Energy Marketers since 2007. Directs six other bodies corporate incl. GK Energy Solar Pvt Ltd and GK Capital LtdAbout 76.2% (about 89.7% pre-IPO)
Mehul Ajit Shah (DIN 03508348)Whole-Time Director and COO. Joined 26 Apr 2011B.Com and MBA (University of Pune). Over 18 years in solar. Directs GK Energy Solar Pvt Ltd and the Gopal Kabra FoundationAbout 3.0% (about 3.6% pre-IPO)
Promoter groupDarshana Gopal KabraNegligible holding (DRHP Aug 2025). Joined as a senior-management person with salary Rs 0.09 cr from 15 Nov 2025 [Fact, AR]negligible

Board of directors (6 members, per company site, Oct 2026)

NameDINRoleExec / IndependentTenureBackground
Gopal Rajaram Kabra02343128Chairman, MD and CEOExecutive, promoterMD since 2 Dec 2024; with company since 2008See above
Mehul Ajit Shah03508348Whole-Time Director and COOExecutive, promoterOn board since 26 Apr 2011See above
Navaniit Narayandas Mandhaani08653090Non-executive director; chairs CSR CommitteeNon-executive, non-independentSince 9 Oct 2024Educator; founder of Ambition's Commerce Classes (since 2007); M.Com and doctorate in accounting depreciation; 17+ years in education; no other directorships. Nature of tie to promoters not verified
Susheel Dwarkadas Bhandari02634291Independent director; chairs Audit CommitteeIndependentAppointment date not shown; before IPOChartered Accountant, B.Com (Pune). 22+ years in education; director of Expert Professional Academy Pvt Ltd since 2015. Bought 25,000 shares (Rs 24.6 lakh) on 27 Mar 2026
Pooja Pawan Chandak02960848Independent director; chairs Stakeholders Relationship CommitteeIndependentAppointment date not shownCA; 16+ years in finance; partner at PSBC and Associates since 2008
Subhash Vasant Ghaisas11479724Independent directorIndependentSince 13 Feb 2026 (postal ballot approval 10 May 2026)PhD Experimental Physics (Pune); 40+ years in renewable energy and physics; former Director, School of Energy Studies, SPPU; visiting professor at DIAT; heads NCERT Physics Panel
Chandra Iyengar (resigned)n/aIndependent directorIndependentResigned effective 26 Feb 2026Cited personal commitments; left SRC and CSR committees; sits on Adani Energy Solutions board; resigned from Bombay Dyeing May 2025

Key managerial personnel

PersonRoleDetail
Gopal KabraChairman, MD, CEOFY26 pay Rs 20.99 cr
Mehul ShahWTD and COOFY26 pay Rs 2.99 cr
Sunil Kamalkishor MaluCFOFY26 pay Rs 1.20 cr (FY25 0.30); tenure about one year per Simply Wall St (joined around late 2025 or just before the IPO); prior employers Not Available
Shubham Suresh JainCompany Secretary and Compliance OfficerFrom 16 Mar 2026; predecessor Jeevan Innani left 14 Mar 2026
Prashant JadhavAGM (Installation and Commissioning)Resigned 10 Dec 2025
Internal auditorBrijesh S. Chandak and Co.Re-appointed 13 May 2026 for FY27
Secretarial auditorCS Avanti RajwadeAppointed 7 Aug 2026 for five years (FY27 to FY31), subject to AGM approval
RegistrarMUFG Intime Indian/a

The KMP is thin and founder-run, with a CFO appointed shortly before the IPO: a key-man risk [Analyst View].

Shareholding trend (Screener, quarter-end)

QuarterPromoterFIIDIIPublicShareholders
Sep 202579.20%1.68%8.64%10.51%65,099
Dec 202579.20%1.02%8.03%11.75%47,617
Mar 202679.20%0.79%8.29%11.72%50,033
Jun 202679.20%1.30%7.16%12.35%53,494
Sep 202679.20%1.00%7.03%12.77%58,390

Jun 2025 (pre-IPO, not comparable): FII 2.92%, DII 9.00% (Dhan). MF holding (Upstox): 2.32% pre-IPO, 3.12% (Dec 25), 3.41% (Mar 26), 3.39% (Jun 26), 3.30% (Sep 26). Sep 2026 SEBI declaration: FPIs 0.99% (4 holders), MFs 3.30%, AIFs 3.73%; holders above 1% (shareholding pattern): VQ Fastercap Fund II 1.88%, HSBC Flexi Cap Fund 1.76%, 360 ONE Flexicap Fund 1.42%. These differ from older Sharekhan scheme-level data (360 ONE FlexiCap 1.27%, HSBC Flexi Cap 0.66%); the Sep 2026 pattern is the primary source and the Sharekhan data is of earlier date. Institutions (FII plus DII) fell from 10.3% to 8.0% over four quarters while retail absorbed it.

Shareholding %, Sep 2025 to Sep 2026 (promoter 79.20% flat, not shown) Public 10.51Public 12.77 DII 8.64DII 7.03 FII 1.68FII 1.00 Sep 25Dec 25Mar 26Jun 26Sep 26

Pre-IPO, anchors and notable holders

InvestorDetail
Valuequest India G.I.F.T. Fund22.88 lakh shares (Rs 35 cr), pre-IPO at Rs 153
VQ FasterCap Fund II19.61 lakh (Rs 30 cr) pre-IPO; 1.88% in Sep 2026
360 One High Growth Companies Fund9.80 lakh (Rs 15 cr)
360 One Equity Opportunities Fund Series 46.54 lakh (Rs 10 cr)
Kotak Iconic Fund and Kotak Iconic Fund II3.27 lakh each (Rs 5 cr each)
Anchor round (18 Sep 2025)Rs 139.27 cr at Rs 153 from 13 funds. Share count reported as 91.03 lakh or 98.03 lakh; Rs 139.27 cr / Rs 153 = 91.03 lakh supports the lower figure [Est.]. Named: HSBC, Citigroup Global Markets Mauritius, Motilal Oswal, Bandhan, PineBridge, Societe Generale, Edelweiss, 360 ONE Flexicap, AAA India Equity Fund
Mutual funds (Sharekhan, earlier data)360 ONE FlexiCap 1.27% (~Rs 28.6 cr); DynaSIF EqExT100LS 1.21%; HSBC Flexi Cap 0.66% (~Rs 38.2 cr); 360 ONE Balanced Hybrid 0.41%; 360 ONE Multi Asset 0.31%; HSBC Infrastructure 0.19%; Bandhan Small Cap 0.01%. No large AMC (SBI, HDFC, ICICI, Nippon) visible
Pivotal EnterprisesReported secondary buyer; holding unknown
Junomoneta Finsol Pvt LtdBulk deal 26 Sep 2025 (listing day): buy and sell of ~18.56 lakh shares at ~Rs 170, a round trip (secondary source, Fyers)

Pledge [Fact]. None. SEBI declaration Sep 2026: no pledges; MarketsMojo none at Mar 2026; no historical pledge found. Insider / SAST: promoter stake unchanged at 79.20% for five quarters; no open-market promoter buying or selling; the only insider deal found is director Susheel Bhandari buying 25,000 shares (Rs 24.6 lakh) on 27 Mar 2026. SAST Reg. 29 filing detail: Not Available (not found). Trading window closed from 1 Oct 2026 until 48 hours after Q2 FY27 results.

Related-party transactions [Fact, AR note 32; RHP p.20]

Counterparties: KMP Gopal Kabra, Mehul Shah, CFO Sunil Malu, company secretary; relatives Darshana, Rajaram and Chandrakanta Kabra, Gopal Kabra HUF, Komal Rathi, Ajit, Prachi and Pratik Shah; concerns Energy Marketers (partnership firm), Beromt Pvt Ltd, Gopal Kabra Foundation, and the subsidiary.

Item, Rs crFY26FY25FY24FY23
Gopal Kabra remuneration20.9913.435.900.48
Mehul Shah remuneration2.992.851.300.24
CFO Malu1.200.30--
Gopal Kabra unsecured loan received / (repaid)91.2 / (91.2)0.05 / -4.5 / --
Interest paid to G. Kabra2.58-n/an/a
Trademark royalty to G. Kabra (0.1% of sales)1.53nil (cooling-off)n/an/a
Purchases from Energy Marketers-0.221.360.36
Purchases from Mira Energy (related until Dec 2022)n/an/an/a13.4
Total RPT (RHP basis)n/a17.4 (1.6% of income)14.2 (3.4%)17.7 (6.2%)

Auditor

ItemDetail
Statutory auditorBharat J. Rughani & Co, Chartered Accountants (FRN 101220W; partner CA Bharat J. Rughani, M.No. 040543)
Appointment17th AGM on 2 Jun 2025, five years to the 22nd AGM (2030). Pre-2025 auditor and any change: Not Available (not read in the RHP sections reviewed)
OpinionUnmodified (FY26 audit signed 13 May 2026). One key audit matter [Fact, AR p.126-127]: recoverability of trade receivables (gross Rs 590.76 cr, ECL Rs 4.69 cr, mostly State Nodal Agencies); the auditor notes balance confirmations are not customarily provided by government counterparties and relied on alternative procedures including post-year-end collections. CARO: no fraud, no wilful default, no defaults on borrowings; unspent CSR of Rs 1.66 cr on ongoing projects moved to a special account
FeesStatutory audit Rs 0.13 cr (FY25 0.08); other services (limited review, IPO certification) Rs 0.03 cr
Independence observation [Est.]The same small firm audits, signs the restated FY23 to FY25 numbers and certifies IPO use (monitoring-agency CA certificates dated 31 Jul 2026). Rs 13 lakh for a Rs 1,700 cr revenue listed company is very low
Other auditorsSecretarial: CS Avanti Rajwade (from 7 Aug 2026). Internal: Brijesh S. Chandak and Co.

Subsidiaries and group structure

EntityRelationshipPurpose and numbersFlags
GK Energy Solar Pvt Ltd100% subsidiary, incorporated 6 Nov 2024; both promoters are directorsDCR cell/module trading and vehicle for the planned module plant. FY26 revenue Rs 182.74 cr, PBT Rs 4.23 cr, PAT Rs 3.02 cr (1.7%), share capital Rs 5 cr, total assets Rs 10.9 cr. Parent gave Rs 13 cr corporate guarantee and Rs 16.7 cr loans (Rs 18.7 cr repaid). Leasehold plot at Tembhurni for Rs 4.05 cr. Q2 FY26: consolidated PAT ~Rs 46.9 cr vs standalone ~46.5 crPlant plan dropped; revenue nil in Q1 FY27. Consolidated purchases of stock in trade Rs 193.6 cr vs standalone Rs 16.4 cr. CEO: "INR 199 crores business including into our wholly-owned subsidiary for the DCR cells securing"; the 199 vs 183 difference is eliminations [Est.]
GK Capital LtdPromoter-linkedNot Available (business not described)Related-party exposure not disclosed
Gopal Kabra FoundationPromoter-linked; CSR vehicle; Shah is a directorCSR spendingCSR shortfall flagged for FY24 (RHP)
Energy MarketersPartnership firm of KabraSupplier: purchases Rs 0.36 cr (FY23), 1.36 (FY24), 0.22 (FY25), nil FY26n/a
Beromt Pvt LtdRelated concernNot Availablen/a
Mira Energy ResourcesRelated until Dec 2022Purchases Rs 13.4 cr in FY23; supplier in FY23 (Rs 11.5 cr) and FY24 (Rs 13.3 cr)n/a
AcquisitionsNone foundNo acquisition track recordn/a

Litigation, tax and board-event timeline

DateEventDetail
As of Sep 2025 (RHP)LitigationNo criminal, regulatory or civil litigation against company, promoters, directors, subsidiary or KMP; three indirect-tax (GST) cases totalling Rs 0.35 cr; no SEBI or exchange action on promoters in five years; no group-company litigation; materiality threshold Rs 4.18 cr. RHP also cites 'certain instances of delays in payment of statutory dues in the past' (p.57), not quantified in what we read
5 Dec 2024Trademark assignmentTo G. Kabra for Rs 1 lakh; licensed back from 1 Apr 2025
10 Dec 2025AGM (installation) resignsPrashant Jadhav
13 Feb 2026Ghaisas appointedIndependent director
26 Feb 2026Iyengar resignsIndependent director, personal commitments
27 Feb to 4 Mar 2026Maharashtra State GST searchSearch at registered office began 27 Feb 13:20, ended 4 Mar; order disclosed 5 Mar. (1) ITC disallowed on IPO expenses Rs 4,75,19,298; (2) ITC reversal on sundry creditors outstanding over 180 days Rs 1,65,46,126; (3) blocked-credit ITC Rs 95,90,977. Total ~Rs 7.4 cr (Rs 7.36 cr). Company: 'no significant impact', appealable, disclosed under Reg. 30. Appeal status: Not Available. [Fact, AR CARO and note 33] disputed GST dues total Rs 5.24 cr (Rs 52.38 mn), of which Rs 4.75 cr (FY25-26 matter before the Joint Commissioner) has already been paid under protest; this equals item (1) and is the contingent-liability line. Item (2) contradicts 'no overdue payables'
14 to 16 Mar 2026CS change and committeesJeevan Innani left 14 Mar; Shubham Jain from 16 Mar (two weeks after the GST order); committees reconstituted 14 Mar
27 Mar 2026Director share purchaseBhandari 25,000 shares
7 Aug 2026Committees reconstituted; secretarial auditor appointed; AGM noticeBorrowing limit to Rs 1,500 cr; revised CEO and COO pay
31 Aug 2026AGMAll resolutions passed

Governance red flags

#FlagSeverity
1Founder pay Rs 20.99 cr (4x in two years; 10.4% of PAT) plus royalty plus the Rs 91.2 cr in-and-out loan with interestHigh
2Trademark owned by promoter, licensed to the company at 0.1% of sales; terminable by the promoterMedium
3Small audit firm, Rs 13 lakh fee, also certifies IPO use; receivables are a key audit matter; the executive Chairman-CEO sits on the Audit CommitteeMedium
4GST search and Rs 7.4 cr order; creditors over 180 days; IPO expenses ITC disallowedMedium
5Board and KMP churn: independent director resigned, CS left, AGM (installation) resigned, new CFO about one yearMedium
6Combined Chairman-MD-CEO, 79.2% one-family control, promoter personal guarantees on all working-capital linesMedium
7Supplier and customer round-tripping with a peer or partner (Ecozen: FY25 customer Rs 165.6 cr and supplier Rs 42.3 cr; Oswal Pumps: top supplier FY23 and FY24, top customer FY23)Medium
8Investor access: no Q3 FY26 call; an investor said management was unavailableLow
9No SEBI order, MCA action, fraud allegation or pledge foundMitigant

Supply Chain

Upstream: what GK Energy depends on

Top-10 suppliers FY25 (RHP p.37 and p.204)

SupplierRs cr% of purchases
Supplier A (name withheld)147.219.8
Redren Energy Pvt Ltd129.017.3
Icon Solar-En Power Technologies Pvt Ltd92.212.4
Silver Consumer Electricals Pvt Ltd75.110.1
Raydean Industries49.96.7
Ecozen Solutions Pvt Ltd (also GK's top customer)42.35.7
Sowell Agro Solutions Pvt Ltd34.54.6
Supplier E (withheld)31.14.2
SB Agri Renewable Pvt Ltd20.42.7
Braj Polymers18.12.4
Top-10~639.8 [Est. sum]86.0
YearTop suppliers (Rs cr, % of purchases)
FY24Oswal Pumps 96.0 (30.1%); Silver Consumer 53.6 (16.8%); Icon 42.9 (13.5%); Supplier A 30.4 (9.5%); Raydean 19.4 (6.1%); then Mira Energy Resources 13.3, Redren 11.0, Ecozen 10.7, Sahaj Solar 7.6, Supplier C 5.0
FY23Oswal Pumps 128.3 (50.0%); Icon 30.3 (11.8%); Supplier A 20.1; Redren 14.9; Silver 13.8; then Mira 11.5, Raydean 9.2, Laxmi Solar 4.7, Sowell 3.4, Supplier D 3.0
ConcentrationTop-5: FY23 Rs 207.40 cr (80.80%); FY24 Rs 242.32 cr (75.97%); FY25 Rs 493.33 cr (66.35%)

[Est.] Column interleaving in the PDF text makes the FY24 and FY23 pairing of a few mid-table names approximate; the FY25 table and the Top-5/Top-10 totals are exact. Notable: Oswal Pumps Ltd, now a listed competitor, was GK's biggest supplier in FY23 (50%) and FY24 (30%) and its largest customer in FY23 (Rs 11.4 cr, 3.99%). Ecozen is both GK's top customer and a FY25 supplier (round-tripping with a peer/partner).

Supplier names withheld. Supplier A, Supplier C, Supplier D and Supplier E are anonymised in the RHP; the identity of the three material creditors and the 875 MW cell supplier is Not Available (searched: RHP, AR, company website pages we could reach).

Downstream: who depends on GK Energy

Customer concentration [Fact]

MeasureFY23FY24FY25
Top customer: Ecozen SolutionsRs 4.3 crRs 68.5 cr (16.67%)Rs 165.6 cr (15.13%)
Top-3 customers5.84% (Oswal Pumps 11.4 cr 3.99%, Ecozen 4.3 cr, SG Enterprises)19.16% (Ecozen, Redren 8.3 cr, Mira 2.0 cr)15.43% (Ecozen; Sunrisers Solar Rs 2.5 cr 0.23%; Sanjivani Rural Education Society Rs 0.84 cr)
DBT farmer sales as % of revenue89.02%74.39%83.83%
Maharashtra %n/dn/d93.12% (CARE: over 90%); 99.8% of Sep 2025 order book

Value-chain map

Polysilicon / wafers / cells (Indian and Chinese cell makers; DCR cells domestic) --> module makers (ALMM)
Pump / motor / controller OEMs; steel; cables
        |
        v
OEM / ODM partners build to GK specification (8 manufacturing-partner states)
        |
        v
GK ENERGY: tender win, design, procurement, kitting, 12 warehouses, 40+ vehicles, installation, 5-year O&M
        |
        v
State nodal agency / MSEDCL (subsidy payer, pays within ~60 days of inspection) + farmer co-payment (DBT portal)
        |
        v
Farm irrigation (solar pump) / household rooftop / JJM water schemes / grid BESS (new)
Where pricing power sits [Analyst View]. (1) With the government: the tender L1 price is fixed and binding on every empanelled vendor. (2) With module/cell and pump OEMs on input costs (limited supplier base, DCR scarcity). (3) GK captures only the EPC spread (about 17 to 20% EBITDA) and relies on scale, procurement efficiency and execution speed. Rooftop adds faster monetisation but similar fixed-rate exposure. The one lever to move up the chain, a module plant, was dropped.

Competitive Position

GK Energy is the third-largest listed solar-pump-scheme player by FY26 revenue, but the fastest grower, and the only one without manufacturing. The sector moved together on 21 Oct 2026. Pricing power is eroding sector-wide.

Who competes with GK

Peer table (Screener consolidated; ratios recomputed; FY26 = year to Mar 2026)

MetricGK EnergyShakti PumpsOswal PumpsWaaree RTL (EPC comp.)Saatvik Green (mfr comp.)
Price / Mcap (Rs cr), 21 Oct 2698 / 1,989402 / 4,956234 / 2,669748 / 7,808373 / 4,742
Revenue FY26 (Rs cr)1,7152,6982,0643,3314,548
Revenue FY25 (Rs cr)1,0952,5161,4301,5982,158
Revenue growth FY2656.7%7.2%44.3%108.5%110.8%
EBITDA FY26 (Rs cr) / margin318 / 18.6% (Screener basis 309 / 18.0%)*422 / 15.6%514 / 24.9%641 / 19.2%543 / 11.9%
PAT FY26 (Rs cr) / margin204 / 11.9%258 / 9.6%376 / 18.2%479 / 14.4%357 / 7.8%
ROE (latest)37.3%18.0%35.2%68.3%42.3%
ROCE41.4%23.6%36.4%83.2%33.0%
P/E (TTM)8.8x23.4x7.9x16.8x19.1x
EV/EBITDA (approx, TTM)~5.1x~15.1x (upper bound)~6.5x (upper bound)~13.3x (upper bound)~14.2x (upper bound)
TTM revenue / EBITDA / PAT (Rs cr)1,896 / 334 / 2272,934 / 361 / 2122,024 / 447 / 3363,936 / 699 / 4764,144 / 401 / 246
Q1 FY27 revenue (Rs cr) / OPM505 / 16%859 / 10%474 / 16%924 / 19%n/a
Borrowings Mar-26 (Rs cr)206505237146 (Sep-26: 1,493)939
Promoter holding79.2% (flat)50.4%75.65%74.3%n/a
Moat (one line)Largest Maharashtra Component-B share, empanelment, asset-light; no manufacturing, no cell integrationManufacturing, 20+ year brand, pumps + motors + inverters; building 2.2 GW cells/modules; exportsPump manufacturer, highest margins/ROE, own pump and motor manufacturing, new inverter lineOrder book Rs 5,500+ cr (19 Oct 2026), group sourcing, not a pump specialistCell/module manufacturing (DCR compliant), MSEDCL pump LoA, big capex programme

*Peers are on the Screener basis (operating profit before other income). GK's company-basis consolidated EBITDA is Rs 318.4 cr (18.6%); on the Screener basis it is Rs 309 cr (18.0%). Method: EV = market cap + borrowings - cash. For GK we used the consolidated net cash of Rs 237.8 cr, giving EV ~Rs 1,751 cr and ~5.1x on TTM EBITDA of Rs 345.5 cr (5.2x on Screener's Rs 334 cr). For peers Screener does not give cash on the fetched page, so EV is mcap + borrowings (an upper bound; true EV/EBITDA is lower). Waaree RTL uses Sep-26 borrowings of Rs 1,493 cr (a sharp jump from Rs 146 cr; not independently verified). 'OPM' for Q1 is Screener's operating margin.

RHP-era FY25 cross-check

FY25GKShaktiOswal
Revenue (Rs cr)1,094.82,516.21,430.3
EBITDA margin18.24%24.0%29.4%
PAT (Rs cr)133.2408.4280.6
Receivable days120152111
P/E at IPO time23.3x26x32x

These match our Screener-derived FY25 numbers (GK 200/1,095 = 18.3%; Shakti 603/2,516 = 24.0%; Oswal 420/1,430 = 29.4%). Several secondary sites (DSIJ, Finology) misprinted the P/E, D/E and year labels; ignore those.

Peer Q1 FY27 read-across

PeerQ1 FY27Read-across
GKRevenue +55.5% (cons.; +71.1% standalone), EBITDA 16.4% vs 17.7% (cons.), PAT Rs 59.65 cr (+60%)Fastest volume growth, margin down
ShaktiRevenue +37.9% to Rs 858.7 cr; installations +57.6% to 27,678; EBITDA margin 9.6% vs 23.1%; PAT -46.7% to Rs 51.6 cr; order book ~Rs 1,000 cr incl. GST (22 Jul 2026)Margin collapse
OswalRevenue -7.9% to Rs 474 cr; EBITDA 17.1% (company) / 15.7% (other report); PAT -43.1%; order book 22,025 pumps; guidance kept at 20 to 25% revenue growth and 15 to 17% EBITDA; realisation -9%, gross margin -548 bp QoQPricing under Magel Tyala tenders

Market position and rank

Market-share data pointBasis
8.56% (42,778 of 499,319 units)Installed base at 30 Sep 2024 (RHP via HDFC Sky)
7.37% national Component B (62,559 of 848,330) and ~15% Maharashtra31 Jul 2025 (CRISIL via RHP)
8 to 9% national; 15%+ MaharashtraCEO, Q4 FY26 call (May 2026); also 'about 9% of PM-KUSUM installs (10 lakh+ pumps)' and '>15% in Maharashtra Magel Tyala'
15 to 18% of tender empanelmentsCRISIL, historical
~82% of sanctioned pump volumeScreener: GK's operating states' share of total PM-KUSUM sanctions (footprint, not share)
#3 listed player by revenueOur ranking above
'70% of country's solar pump business is in Maharashtra'CEO, Q1 FY27 call
Component B sanctioned ~14 lakh pumps; ~11.8 lakh installed (90%)CSE

Revenue concentration cross-checks: ICRA ~99% from government pump schemes; IndMoney/RHP PM-KUSUM 84% of FY25; Maharashtra 93%; SP Tulsian over 90% Maharashtra; Value Research ~86% of projects in five states (Maharashtra, Haryana, Rajasthan, UP, MP). Largest client ~15%.

Strengths and weaknesses by peer [Analyst View]

VersusGK strengthsGK weaknesses
Shakti PumpsFaster growth (56.7% vs 7.2%), higher FY26 EBITDA margin (18.0 to 18.6% vs 15.6%) and PAT margin (11.9% vs 9.6%), P/E 8.8x vs 23.4x, net cash vs Rs 505 cr debt, higher ROE (37% vs 18%), lower capex intensity, Maharashtra share leadership36% smaller revenue; no manufacturing (Shakti makes pumps, motors, controllers and is moving to cells/modules and inverters); no exports or C&I diversification; higher geographic concentration; lower procurement scale
Oswal PumpsFaster FY26 growth (56.7% vs 44.3%), Q1 FY27 growth (+55% vs -8%), net cashStructurally lower margins (18% vs 24.9% EBITDA; 11.9% vs 18.2% PAT); no manufacturing moat; fewer product lines; Oswal already contracting in Q1 FY27, a warning on where GK's pricing may go
Waaree RTL / SaatvikPure-play depth in pump installation and logistics (15,000 pumps/month, 7,500+ villages), low debtSub-scale vs 2 to 3x revenue; no module/cell manufacturing in a DCR/ALMM market; weaker order visibility (Rs 541 cr vs Rs 5,500+ cr); single-scheme revenue base

Industry structure and size

ItemDetail
India solar pump market (RHP / CRISIL)Rs 19.3 bn (FY19) to ~Rs 39 bn (FY24), 15% historical CAGR; projected Rs 300 to 320 bn (Rs 30,000 to 32,000 cr) by FY29, a ~52% CAGR [Est. check: (310/39)^(1/5) = 1.52]. The forecast is aggressive vs history and contingent on PM-KUSUM 2.0. DSIJ's 'Rs 3 to 3.2 lakh cr' is a 10x unit error
Third-party estimatesIMARC / MarkNtel: ~USD 139 to 154 mn (2025/26), 6.9 to 7% CAGR, different scope; footnote only
Addressable base~30 million agricultural pumps (8 mn diesel, 22 mn grid-electric); government target cited 1.4 mn solar pumps
PM-KUSUM Phase 1Central outlay Rs 34,422 cr (Business Today). Component B 11.8 lakh pumps installed = 90% of sanctioned target (CSE); Component A 2,200 MW of 10,000 MW (22%); Component C no data
PM Surya Ghar (rooftop)More than 63 lakh applications, ~32 lakh beneficiaries by May 2026, target 1 crore households by FY27. GK says national rooftop market ~70 lakh systems; Maharashtra 1 kW 'Smart Scheme' Rs 300 to 400 cr opportunity
Subsidy structure30% central + 30% state + 40% farmer (non-NE/hill states); central support cap 7.5 HP; bank finance up to 30 points of farmer share
Pricing under MSEDCLAwards matched across vendors and then split: GK Rs 276.93 cr (10,000 pumps, ~Rs 2.77 lakh); Shakti Rs 155.24 cr (6,580 pumps) and Rs 235.92 cr (10,000 pumps, ~Rs 2.36 lakh); Oswal Rs 380 cr (13,738 pumps, ~Rs 2.77 lakh); HP mix differs

Key trends

Policy and regulatory items

ItemStatusImpact on GK
PM-KUSUM 1.0PEDA: closed w.e.f. 31 Dec 2025. MNRE (Apr 2026) extended project completion to 31 Mar 2027 for projects with PPAs/sanctions on or before 31 Dec 2025 (applicability to Component B unclear)Existing book can still be executed; no new central sanctions until 2.0
PM-KUSUM 2.0Announced Mar 2026; no formal notification found by 21 Oct 2026. CEO: 'work should start by end of Q3'; 'announcement may come by September'. Choice expected notification by end H1 FY27 (Sep-end 2026). Minister's Assembly reply said money distributed to ministries; CEO dismissed it as unrelatedBinary driver for FY27 to FY28 order inflow
DCR / ALMM List-IIDCR not relaxed for PM-KUSUM; ALMM List-II (cells) effective 1 Jun 2026Cost and availability risk; integrated rivals advantaged
ALMM exemptionsJuly 2026 MNRE order exempting net-metering/open-access projects to 31 Dec 2026 (single source, unverified)Not relevant to Component B
GST rate on solar pumps/modulesNot Available: not foundOpen item
MSEDCL payment behaviourPayment lag is the main working-capital driverSee risks
PLI (high-efficiency modules)Benefits integrated manufacturers, not asset-light EPC [Est.]GK is a user of DCR supply, not a PLI beneficiary
PM Surya Ghar / Smart SchemeRunningDiversification; low margin, retail-fragmented

Barriers to entry, Porter's Five Forces and moat

ForceRatingReasoning
RivalryHighFew listed players plus many empanelled regional vendors; matched-L1 pricing; margin compression visible in Q1 FY27
Buyer powerVery highSingle dominant buyer per state, government price discovery, 90 to 125 day payment cycle
Supplier powerModerate-highOEM/ODM partners, DCR scarcity, steel/copper inflation, key suppliers undisclosed
New entrantsModerateEasy for pump makers and EPC firms; capital and empanelment limit the very small
SubstitutesLow-moderateGrid-connected pump solarisation (Component C / feeder solarisation), diesel and grid alternatives; feeder-level policy tilt is a partial substitute

Risks & Red Flags

Red-flag checklist (as of 21 Oct 2026)

Red flagFinding
Rising debtBorrowings Rs 62 to 218 to 206 cr; 92% short-term working capital; D/E low post-IPO. Management guided debt may rise in FY27, cost ~9% +/- 1%; limit to be raised to Rs 1,500 cr. Not a flag today
Margin deteriorationYes. Q1 FY27 standalone EBITDA 17.05% vs 19.74%; consolidated 16.4% vs 17.7%; peers' margins fell far more
Auditor concernsNo qualification; receivables recoverability is a key audit matter (no balance confirmations from state agencies). Small firm, Rs 13 lakh fee, also certifies IPO use; pre-2025 auditor not found
Related-partyFounder pay Rs 20.99 cr, royalty Rs 1.53 cr, Rs 91.2 cr loan in and out with Rs 2.58 cr interest, promoter-family loans Rs 8.63 cr, promoter relative hired
Promoter sellingOFS at IPO: Kabra 40 lakh shares (~Rs 61.2 cr), Shah 2 lakh (~Rs 3.1 cr). 79.20% flat since. See Tab 7 on the unsupported Rs 128 cr figure
DilutionIPO fresh issue Rs 400 cr (12.9% of post-issue shares; ~15% on the pre-issue count); equity capital Rs 34 to 40.6 cr; no ESOPs, warrants or further fund-raise
Customer lossLargest client ~15% (FY25); order-book decline is the functional proxy
Litigation / taxGST order ~Rs 7.4 cr (appealable); contingent GST Rs 5.24 cr; RHP: three GST cases Rs 0.35 cr
Commodity / currency / rateFixed-price EPC; module, steel and copper cost spikes between bid and execution; no material FX exposure identified; debt cost ~9%
Technology obsolescenceLow near term (BLDC/DC pumps); risk is scheme redesign toward feeder solarisation, agri-PV and BESS
Key personHigh: founder is Chairman, MD, CEO, controls the brand (royalty) and took the OFS
Cash-flow qualityFY23 to FY25 CFO negative; FY26 CFO Rs 52.9 cr vs PAT Rs 201.3 cr; FCF negative every year
Capital allocation~Rs 62 to 90 cr on a head office (collateral for bank limits per management); asset-light ethos questioned

Risk register

#RiskCategorySeverityExplanationMitigant
1Single-scheme dependence (PM-KUSUM / Magel Tyala ~84 to 99% of revenue)RegulatoryHigh1.0 closed Dec 2025; 2.0 not notified; ICRA ~99% scheme revenueManagement expects 2.0 from Q3 FY27; rooftop (20% of book), MP and five other states; no firm diversification yet
2PM-KUSUM 2.0 design shifts away from stand-alone pumpsRegulatoryHighPump share of the Rs 50 to 51k cr outlay unknown; mandated BESS could raise cost and delayLarge pump backlog (Maharashtra, MP); CSE/MNRE signals pumps remain a component
3Order-book shrinkage vs guidanceBusinessHighRs 1,029 cr to 541 cr (the latter includes orders to 7 Aug); ~Rs 1,954 cr of Rs 3,000 cr FY27 guidance unbooked at 7 Aug (~Rs 1,500 cr after the 26 Aug Rs 454.5 cr rooftop empanelment) [Est.]; Q4 is 35 to 40% of annual businessPhase 6/7 Magel Tyala bids, Rs 454.5 cr rooftop empanelment, 15,000 pumps/month capacity
4Tender price competition and margin compressionBusinessHighOswal realisation -9%, Shakti EBITDA 23.1% to 9.6%; GK revenue per pump about -23% [Est.]Asset-light; OEM volume negotiation; management guides a double-digit net (PAT) margin
5Geographic concentration (Maharashtra ~93%)BusinessHighMSEDCL funding and politics; state budget; CARE flags itExpansion in MP, UP, Rajasthan, Haryana, Chhattisgarh; no new states near term
6Receivables and working capitalFinancialHighDebtor days 125 to 140; CCC 102; CARE trigger operating cycle above 150 daysNet cash snapshot; BG/CC limits; management says cycles normalising
7Earnings do not convert to cashFinancialHighCFO/PAT 26%; five-year cumulative CFO negative; IPO funds spentFY26 first positive CFO; collections strong in H2
8Counterparty / discom payment riskFinancialMedium-HighSubsidy release lag and discom financesGovernment-backed counterparties; no bad-debt disclosure found (ECL Rs 4.7 cr)
9DCR / ALMM List-II cell availability and costRegulatoryMedium-HighNo manufacturing; single 875 MW supplier to 31 Mar 2027; integrated rivalsSupply agreement; ODM partners
10Backward-integration reversalExecutionMediumPlant dropped; ICRA flagged funding/execution risk earlier; margin stays at EPC spreadAsset-light fallback
11Raw-material inflation on fixed-price contractsBusinessMediumPanels, steel, copper elevated; 60-day bid-to-execution lagPrice freezes for 3 to 6 months, advances to suppliers
12Execution and quality in rural installation (theft, warranty)ExecutionMediumFailure can cost empanelment; 5-year O&M tailInstaller network; 164,500 systems installed; buffer stock
13Key-person dependency (founder)GovernanceMediumChairman-MD-CEO, royalty recipient, 79% promoterProfessional CFO and COO; stable holding
14Related-party economicsGovernanceMediumPay Rs 20.99 cr (10.4% of PAT, near 11% cap), royalty 0.1% of sales scaling with revenue, Rs 91.2 cr loan with interestBoard-approved; AGM resolution; royalty small vs PAT (<1%)
15Audit quality / independenceGovernanceMediumRs 13 lakh fee; same firm certifies IPO useUnmodified opinion; five-year appointment
16GST search and orderRegulatoryMedium~Rs 7.4 cr; creditors over 180 days; may recur in other tax headsAppeal; amount ~3.7% of FY26 PAT
17Stock overhang and liquidityFinancialMediumFree float ~20.8%; promoter lock-in ends ~Mar 2027; stock 36% below issue price; volume spikes on 21 Sep 2026 (1.43 mn shares, ~3x average) and 30 Sep 2026 (1.28 mn) during the slide, which could be lock-in related block trading [Est.] but no deal record was availablePromoter has not sold post-IPO
18Credit-rating headroomFinancialLow-MediumBBB+ (ICRA, CARE), BBB+ (Infomerics); CARE triggers distantLow gross D/E post-IPO
19Policy-delay-driven lumpinessBusinessMediumBack-ended revenue; Q1 FY27 may overstate run-rateQ4 FY26 PAT margin 14.1% shows scale
20Competition from integrated peersBusinessMediumShakti 2.2 GW; Oswal inverters; SaatvikGK EBITDA 18% above Shakti 15.6%
21BESS capital intensityExecutionMediumRs 42.84 cr/yr for 15 years on 300 MWh; capex and funding undisclosed by the company (a research-file estimate, not company data, suggests Rs 500+ cr project cost); contradicts the earlier 'BESS beyond 5 years' stanceVGF support; 18 months to commission
22Litigation / contingent liabilitiesGovernanceLow-MediumContingent Rs 117.79 cr (BG Rs 99.4 cr); statutory-dues delays disclosed in RHPNo material litigation found
23Climate / monsoon / groundwaterESGLow-MediumRain delayed Q4 FY26 installs; irrigation patterns; over-extractionSolar pumps replace diesel
24Interest rateMacroLow~Rs 206 cr at ~9% +/- 1%Net cash
25ESG disclosureESGLowProduct positive (diesel substitution); labour/RPT disclosure for installers not foundn/a
The five that decide the outcome [Analyst View]: (1) order book falling against a doubling guide; (2) CFO Rs 53 cr vs PAT Rs 201 cr; (3) about 99% government-scheme revenue; (4) module plant dropped, leaving no cost advantage; (5) founder pay and royalty rising faster than profits.

Concall Highlights & Guidance

Calls held since listing: three (Q2 FY26 on 20 Nov 2025; Q4 FY26 on 13 May 2026; Q1 FY27 on 7 Aug 2026). No Q3 FY26 call was held; only an investor presentation (16 Feb 2026). Q1 FY26 (Jun 2025) was pre-listing (Oct 2025 presentation only). Transcripts for Nov 2025, May 2026 and Aug 2026 were extracted from the company's PDFs in the gap-fill; earlier summary-only content from aggregators (Arthneeti, Multibagg, SAHI, SolarQuarter, Energetica, Business Standard) is tagged 'per summary'. Analyst names asking questions could not be retrieved.

Q2 FY26 call, 20 Nov 2025 (hosted by IIFL; Kabra, Shah, Malu). First call after listing

Q3 FY26: no call; presentation 16 Feb 2026

Q4 FY26 / FY26 call, 13 May 2026 (Kabra, Malu)

Q1 FY27 call, 7 Aug 2026 (Kabra, Malu; hosted by Churchgate Advisory)

Guidance vs outcome (credibility check)

DateGuidance / statementOutcomeVerdict
Nov 2025H2 FY26 ~50,000 pumps; FY26 70,000 to 75,000FY26 delivered 61,085 (Q3 ~19k, Q4 ~17k); 15 to 20% miss. Reasons given: rain, raw-material supply in the last weeks of March, end-Feb 'war'MISS
Nov 2025EBITDA margin stable/improveQ3 20.54%, Q4 20.54%, FY26 20.44% (vs 18.64%), standaloneMET
Nov 2025Receivable delay short-term; Q3 well under control (135 to 192 days Sep-24 to Sep-25)Mar-26 debtor days 140 (consolidated 125); receivables Rs 586 cr; collections strong in H2PARTIAL
Nov 2025Magel Tyala ~1 lakh pump bid; order release soonDec 2025: 13,239 pumps (Rs 366.6 cr) + 10,000 pumps (Rs 276.9 cr) = ~23k pumps; Phase 5 still 'under evaluation' in May 2026PARTIAL
Nov 20251 GW module plant 'operational by September 2026 or before'Dropped by May 2026; not in Q3 deckDROPPED
Nov 20255 to 6 months of order coverBook fell to Rs 541 cr by JuneShrank
Nov 2025Net debt would rise in FY26Opposite: net cash Rs 240 cr at MarchBetter
May 2026Order book ~Rs 1,400 cr by end Q1 FY27Rs 541 cr as of 7 Aug (30 Jun book plus orders received to then, so the 3 Jul Rs 48.0 cr and 6 Jul Rs 235.9 cr awards are already inside it). Adding the 26 Aug Rs 454.5 cr rooftop empanelment gives ~Rs 995 cr by end-Aug [Est.], ~29% short of Rs 1,400 crSLIPPED
May 2026Rs 300 to 400 cr Smart Scheme rooftopRs 454.5 cr / 100 MW empanelment (Aug)MET (late, above range)
May 2026FY27 revenue ~Rs 3,000 cr; Q4 = 35 to 40%; 140 to 150 working-capital daysQ1 Rs 505 cr (17%); needs ~Rs 830 cr a quarter in Q2 to Q4 (1.6x Q1)OPEN, high risk
May 2026'Double digit' margin, clarified by the CEO as a net (PAT) margin; EBITDA 'right now 20%' with 10 to 15% variation possible; PAT growth at least 51% (per summary)Q1 PAT margin 11.8% and PAT +61.6%; EBITDA margin 17.05%On track
Aug 2026PM-KUSUM 2.0 'by Q3'; 'announcement may come by September'No announcement found by 21 OctLATE
Aug 2026Realisation 'will remain the same'Margin down to 17.05% in Q1 FY27Contradicted
Jul 2026 (SAHI)20% EBITDA margin FY27 (non-quoted media attribution)Not a contradiction: the CEO himself said EBITDA was about 20% in May; Q1 FY27 was 17.05%Unverified

Overall: margin guidance reliable; volume, order-flow and capex-timing guidance repeatedly optimistic. Explanations tend to externalise (policy delay, weather, war).

Management tone over time

PeriodToneMarker
Nov 2025Confident, ambitiousCells, 70 to 75k pumps
Feb 2026SilentNo call
May 2026MixedConfident on 2x revenue, defensive on Q4 (rain, war, raw material) and PM-KUSUM 2.0 delay
Aug 2026Measured'Anticipated' margin softness; accepts order-book scrutiny; leans on rooftop and BESS

Hidden-risk Q&A signals and contradictions

Growth, Outlook & Valuation

Order book (Rs cr)

DateTotalPumpsRooftop
31 Mar 2025714.28714n/d
15 Aug 20251,028.961,008.8820.08
30 Sep 2025863.98846.15 (36,444 pumps)17.83 (4.04 MW)
31 Dec 2025803.24787.58 (33,067 pumps)15.66 (3.55 MW)
31 Mar 2026710 (incl. ~Rs 350 cr recent order)n/d (mostly Magel Tyala per the call)n/d (some MP rooftop)
30 Jun 2026 plus orders received to 7 Aug 2026 (deck: "order book as at 30 June 2026 and including orders received post June")541~80%~20% (~Rs 108 cr)

The Rs 710 cr and Rs 541 cr figures both include post-period orders (to mid-May and 7 Aug respectively). The stand-alone 30 Jun 2026 book is not disclosed; if the 3 Jul Rs 48.02 cr and 6 Jul Rs 235.92 cr awards are inside the Rs 541 cr, as the wording implies, it would have been about Rs 257 cr [Est.].

Order book, Rs cr 71431 Mar 25 1,02915 Aug 25 86430 Sep 25 80331 Dec 25 71031 Mar 26 541Jun 26+ Order book fell 47% from the Aug 2025 peak while FY27 revenue guidance doubledMar 26 includes orders to mid-May; Jun 26+ includes orders to 7 Aug (deck)

Order wins since Dec 2025 (client mostly MSEDCL, Maharashtra)

DateOrderValueDetail
11 Dec 2025MSEDCL Magel Tyala letter of awardRs 366.63 cr13,239 pumps
24 Dec 2025 (one file dates the same item Apr 2026)MSEDCL PM-KUSUM B LoE amendment, 10,000 off-grid pumpsRs 276.93 cr (incl. GST); one press item (Business Standard, 24 Dec) reported the amendment as Rs 254 crTakes MSEDCL book to Rs 637.83 cr; stock +5%. The Dec 2025 and 'Apr 2026' entries in two research files carry identical value and units and are treated as likely the same award, not counted twice. ScanX also cited two 'infrastructure' contracts of Rs 530 cr combined (unclear, verify)
6 May 2026MSEDCL empanelmentRs 353.89 cr incl. GST15,000 pumps
3 Jul 202610 MW rooftopRs 48.02 cr1,150 sites, 90 days (domestic discom). Already inside the Rs 541 cr book
6 to 8 Jul 2026MSEDCL 10,000 off-grid DC pumps (Magel Tyala), LoE 6 JulRs 235.92 cr3/5/7.5 HP, execute within 60 days. Probable, not confirmed [Est.]: Shakti was reported to have an identical Rs 235.92 cr / 10,000-pump award. Evidence it is also GK's: management's ">Rs 1,092 cr since 1 Apr 2026" equals 353.89 + 48.02 + 235.92 + 454.50 = 1,092.33; and L1-matched pricing gives the same Rs 2.36 lakh per pump for Shakti (155.24/6,580), GK (353.89/15,000) and this award. Not seen in an exchange filing. Already included in the Rs 541 cr order book
26 to 31 Aug 2026Rooftop empanelment, 100 MW / 1 lakh households (1 kW)Rs 454.50 cr incl. GST (Rs 45,450/kW)60 days, 5-year O&M; state discom not named; stock +9% on 26 Aug
21 to 22 Sep 2026MSEDCL BESS letter of awardRs 42.84 cr a year for 15 years150 MW / 300 MWh, VGF e-reverse auction (tender 2,000 MW / 4,000 MWh); tariff Rs 2.38 lakh/MW/month; commissioning within 18 months of BESPA; stock +5% to +6% on the day (sources differ), Yahoo close about Rs 126.6 and ~Rs 126.95 per another source. One research file estimated the project cost at Rs 500+ cr; the company has disclosed no capex
2 Jul 2026 (SAHI)5 MW Gujarat industrial rooftop win; mention of a regional BESS partnern/dNot detailed in any filing we read
Cumulative since 1 Apr 2026Management claimMore than Rs 1,092 cr incl. GSTAllocations / empanelments. Reconciles to 353.89 (6 May) + 48.02 + 235.92 + 454.50 = 1,092.33 [Est.]; the Dec 2025 awards (366.63, 276.93) are not in it, which also supports the Dec 2025 dating of the Rs 276.93 cr award

Book-to-bill is not derivable: both the Rs 710 cr and the Rs 541 cr figures include post-period orders, so a quarterly bookings figure cannot be computed from them. Orders after 7 Aug add only the 26 Aug Rs 454.5 cr rooftop empanelment (the BESS award pays Rs 42.84 cr a year over 15 years and is not comparable). Visibility: ~100% government/discom-driven; orders are letters of empanelment/award with 60 to 90 day execution windows (short-cycle, so the book is by nature thin and replenished late). Repeat vs new: essentially repeat (MSEDCL Magel Tyala phases 1 to 7; PM-KUSUM).

FY27 guidance math [Est.]

ItemRs cr
FY27 revenue guidance~3,000 (pumps 2,200 to 2,400 on 1.2 to 1.4 lakh units; rooftop 600 to 1,000)
vs FY26 revenue1.75x consolidated 1,715; 1.96x standalone 1,533 (mgmt: 'doubling')
Q1 FY27 delivered505 (17%)
Remaining for Q2 to Q42,495 (~830 a quarter, 1.6x Q1)
Order book at 7 Aug 2026 (30 Jun book plus orders received to then)541 (22% of the remaining need)
Unbooked at 7 Aug~1,954
Unbooked after the 26 Aug Rs 454.5 cr rooftop empanelment (the only later order of size)~1,500
H2 revenue needed~Rs 1,500+ cr vs H1 ~Rs 910 cr (Q1 505 + Q2 estimate)
Analyst-framed worst case, accepted by the CEORevenue 2,500 / PAT 250
FY27 Rs 3,000 cr guidance: delivered, booked, unbooked (Rs cr, book as at 7 Aug 2026) Q1: 505 Book: 541 Unbooked: ~1,954 (65%) Scale 500 px = Rs 3,000 cr. The 26 Aug Rs 454.5 cr empanelment reduces the unbooked piece to ~Rs 1,500 cr

Expansion plans and capex

Catalysts

HorizonCatalystDirection
Mid-Nov 2026Q2 FY27 results (Q2 FY26 was reported 17 Nov 2025; date not announced; trading window closed since 1 Oct)Binary: CFO, debtor days, margin, order book
Q3 FY27 (management view)PM-KUSUM 2.0 notification and first ordersPositive if stand-alone pumps included; negative if feeder-tilted
12 monthsMagel Tyala Phase 6 and 7 awards; Smart Scheme rooftop execution (60-day windows); BESS financial closeOrder-book rebuild
12 monthsMNRE 31 Mar 2027 completion deadline for existing projectsPull-forward of execution
~Mar 2027Promoter 18-month lock-in expiry (20.1% of capital)Possible overhang
3 to 5 yearsRooftop scale-up, 1 million systems, BESS, hybrid pumpsDiversification

Management guidance (as stated)

MetricGuidanceSource
FY27 revenue~Rs 3,000 crQ4 FY26 call, reaffirmed Q1 FY27
Pump installs120,000 to 140,000Q4 FY26 call
PAT marginDouble-digit (CEO: "it shall be net margin only"); PAT growth similar to or better than FY26's 51% (per summary)Q4 FY26 and Q1 FY27 calls
EBITDA marginNo formal guidance. CEO May 2026: "I think it's 20% right now", 10 to 15% variation possible; media: 20% by FY27, unverifiedQ4 FY26 call; SAHI Jul 2026
Working-capital days140 to 150May 2026
Finance costQ1 FY27 level (Rs 4.6 cr/quarter) 'shall stay in this range'; debt may rise with volumesQ1 FY27 call
Royalty~Rs 3 cr at FY27 guidance [Est.]Our arithmetic

Valuation

MetricAt IPO (Rs 153)May 2026 (Rs 125)21 Oct 2026 (Rs 98)*
Market cap~Rs 3,100 cr (post-pre-IPO)Rs 2,516 crRs 1,989 cr
P/E23.3x FY25 EPS12.4x TTM8.8x TTM (EPS 11.17); 9.0x FY26 EPS 10.90
P/Bn/a3.26x~2.2x (BV Rs 43.8)
EV/EBITDAn/a8.4x~5.1x (EV ~Rs 1,751 cr; TTM EBITDA Rs 345.5 cr company basis) [Est.]
EV/Salesn/a1.66x~0.9x
Dividend yieldn/an/a0.5%

*Price verified via Yahoo NSE series only, not exchange-official. 3-year average multiples are not meaningful (listed 13 months); against its own listing history the stock is at the low end (IPO 23x to ~9x) with FY26 PAT growth of +53%. Peers at IPO: Shakti P/E 26, Oswal 32. Earlier files computed EV/EBITDA at 5.2x using Screener's TTM; 5.1x reflects the company EBITDA basis (incl. other income).

Share-price path since listing, and peers on 21 Oct 2026

Cause of the October fall: unexplained. No company-specific October filing, bulk/block deal or promoter sale was found, and no October 2026 news on the stock or on PM-KUSUM 2.0. Sector-wide moves on the same day are [Fact]; the candidate drivers listed in Tab 2 are [Est.] and unproven.
DatePrice (Rs)Note
26 Sep 2025171 NSE open / 165 BSE openListing (issue price 153); intraday high ~173.65; Junomoneta Finsol round-trip bulk trade ~18.56 lakh shares at ~170
23 Oct 2025239.6052-week high (+57% vs issue). NSE sought a price-movement clarification; company said no pending announcements (TipRanks, 24 Oct 2025)
24 Dec 2025151.85Balance anchor lock-in expiry
Mar 2026116.55Upper circuit after Q3 (per Torus)
2 Apr 202687.2052-week low
6 May 2026134.9n/a
13 May 2026125Q4 FY26 call period
7 Aug 2026~138+6.5% on Q1 FY27 results
10 Aug 2026133.5n/a
26 Aug 2026n/d+9% on Rs 454.5 cr rooftop empanelment
27 Aug 2026~137 to 139NSE market cap Rs 2,827 cr
28 Aug 2026140.05n/a
31 Aug 2026133.2Yahoo series start of the slide
18 Sep 2026119.8n/a
21 Sep 2026126.6BESS award day; volume 1.43 mn (~3x average)
30 Sep 2026119.9Volume 1.28 mn
1 Oct 2026114.8Volume 1.10 mn
12 Oct 2026109.1n/a
16 Oct 2026~107n/a
19 Oct 2026103.07n/a
21 Oct 202698.00Open 103.88, high 104.97, low 97.79, volume 443,113; -4.9%. About -26% from 31 Aug over seven weeks; -36% vs issue price
GKENERGY price path, Rs (selected dates; not to time scale). Dashed line = issue price 153 153 171239.6151.9116.687.2 134.9125133.5140126.6119.9109.1103.198 Listing23 Oct24 DecMar 262 Apr6 May13 May10 Aug28 Aug21 Sep30 Sep12 Oct19 Oct21 Oct Screener 1-year price CAGR: -56%. Yahoo NSE series is not exchange-official

Peers on and before 21 Oct 2026

Stock21 Oct 2026 close / moveEarlier reference
GK EnergyRs 98.00 / -4.9% (Screener -4.99%)103.07 on 19 Oct
Shakti PumpsRs 401.65 / -3.3% (near its 52-week low of Rs 399)443.4 on 5 Oct (-9% in 12 sessions)
Oswal PumpsRs 234.65 / -4.9% (another source: -5.2%)265.1 on 5 Oct (-11.5%)
Waaree Renewable Technologies-9.5% (Rs 748 on the day)Not in the Yahoo pull; from the Screener-based competition file
Saatvik Green Energy-3.9% (Rs 373 on the day)Same source

[Est.] The 21 Sep and 30 Sep 2026 volume spikes could be lock-in or anniversary-related block trading, but no bulk/block record was available (NSE archives blocked). The Yahoo series has no row for 20 Oct; the reason was not checked.

Scenario arithmetic [Est.] (not a price target)

ScenarioFY27 revenuePATP/E at Rs 98 (mcap Rs 1,989 cr)
Trailing (TTM)1,896~2278.8x
CEO worst case2,5002508.0x
Guidance at 10% PAT margin3,0003006.6x
Guidance at 12% PAT margin (Q1 FY27 11.8%)3,0003605.5x
Earnings stall at FY26flat~2049.7x

Street and analyst coverage

No formal post-listing sell-side coverage with targets exists. Trendlyne lists only three reports, all IPO notes; Stockopedia, Sharekhan, Screener, Univest and Kalkine carry no broker rating. A consensus table (Buy/Hold/Sell, low/median/high target, FY+1 and FY+2 estimates) cannot be built and is stated as Not Available rather than invented. Searched: Trendlyne, Screener, Sharekhan, Business Standard, Kotak Neo, Upstox, Stockopedia, aggregator pages.
SourceRatingDateNotes
SBI SecuritiesSubscribe17 Sep 2025IPO note, no target
VenturaSubscribe18 Sep 2025IPO note
Hem SecuritiesSubscribe19 Sep 2025IPO note
Canara Bank SecuritiesSubscribe (long term)Sep 2025Business Standard / Goodreturns
Angel OneSubscribeSep 2025Attractive at Rs 153 band top, 23.3x post-issue P/E vs peers; order book
GeojitSubscribe (medium-long term)Sep 2025Asset-light scalable EPC, PM-KUSUM leadership, rooftop/water expansion
DSIJAvoid (per summary, garbled numbers)Sep 2025Concentration, negative CFO Rs -98.6 cr FY25, high receivables
Goodreturns'About 80% of brokerages' said SubscribeSep 2025Unnamed
MarketsMOJO (quant, not sell-side)Buy to Hold 27 Apr, 26 May, 23 Jul 2026; Buy write-up 31 Aug 2026; related headlines Hold 2 and 13 Oct (unconfirmed)2026Mojo score 64 then 58; technicals weak; institutional holding down 0.62 pts to 8.46%; valuation 'attractive', P/B 3.1, ROE 22.8%, Debt/EBITDA 0.67x
Univest blog (self-modelled)Targets Rs 180 (2026), 190 (2027), 225 (2028), 310 (2030)n/aNot a brokerage; stale vs Rs 98
KalkineNo rating23 Apr 2026Trailing P/E ~14x 'lowest in cohort'; warns low multiple 'should not be misread as mispricing'; policy risk 'largest single variable'
Sharekhan poll (6 votes)Buy 50% / Hold 33% / Sell 17%n/aStatistically meaningless
Choice (sector read-across)Shakti 'Add' TP Rs 640; Oswal 'Add' TP Rs 4502 Jul 2026GK not covered; re-rating hinges on formal PM-KUSUM 2.0 notification (expected by end H1 FY27); not confirmed notified by 21 Oct
ConsensusNot Availablen/aIllustrative: Univest Rs 180 = +84% vs Rs 98; IPO price Rs 153 = +56%

Watch for first initiations after Arihant hosted GK at its Bharat Connect conference on 30 Sep 2026; none found. Dividend: Rs 0.50/share. Buyback: none.

Final Verdict

Business QualityMedium
Management QualityMedium
Financial QualityWeak
ValuationAttractive
Overall ViewNeutral
DimensionRatingEvidence
Business qualityMediumFast volume growth, ISO 9001, 164,500 systems, 726 MW, 7,500 villages, ROCE 41%; but 99% scheme revenue, 93% Maharashtra, no moat beyond execution, no manufacturing, module plant dropped
Management qualityMediumMargin guidance met; net-cash outcome better than guided; no pledge, no promoter selling; but volume and capex guidance missed, founder pay Rs 20.99 cr plus royalty plus Rs 91.2 cr loan, small auditor, GST order, KMP churn, no Q3 call
Financial qualityWeakCFO Rs 52.9 cr vs PAT Rs 201.3 cr (26%); FCF negative every year; IPO money spent; cash partly lien-marked; BBB+ ratings
ValuationAttractive8.8x TTM P/E, ~2.2x book, ~5.1x EV/EBITDA, 0.5% yield; cheap on reported earnings
OverallNeutralCheap price against unproven cash conversion and a shrinking order book

Bull case (3 reasons)

Bear case (3 reasons)

Base case (12 to 18 months) [Analyst View]

Revenue grows but below the Rs 3,000 cr guide (the CEO's own floor is Rs 2,500 cr), margins settle in the 16 to 18% EBITDA band, PM-KUSUM 2.0 is notified late with a smaller stand-alone pump share, and operating cash flow improves but stays below PAT. On that path earnings are roughly Rs 230 to 260 cr and the stock is rangebound around 8 to 10x, so upside depends on a re-rating that only cash conversion and notified policy can deliver. The Q2 FY27 print and the PM-KUSUM 2.0 notification are the nearest tests.

Five things to remember

  1. Reconciled FY26 numbers: consolidated revenue Rs 1,715 cr vs standalone Rs 1,533 cr (DCR trading subsidiary, 2.8% EBITDA); EBITDA margin 18.6% consolidated vs 20.44% company-stated standalone.
  2. Operating cash flow Rs 52.9 cr vs PAT Rs 201.3 cr; the Rs 240 cr net cash is IPO-derived and partly encumbered.
  3. Order book Rs 1,029 cr to Rs 541 cr (7 Aug, including post-June orders); ~99% government-scheme revenue; 93% Maharashtra.
  4. Module plant dropped; the 875 MW cell contract is the only supply hedge.
  5. Price Rs 98 is verified only on the Yahoo NSE series; the cause of the October fall is unexplained.

Five questions an investor must ask

  1. What is Q2 FY27 operating cash flow, debtor days and order book, and has the March receivable collection reversed?
  2. Has PM-KUSUM 2.0 been notified, and what share goes to stand-alone pumps rather than feeder solarisation, agri-PV and BESS?
  3. How is Rs 3,000 cr achieved when only Rs 541 cr was booked at 7 Aug, and can the company confirm in a filing the Rs 235.92 cr 10,000-pump award?
  4. Why were founder pay (Rs 20.99 cr), the 0.1% royalty and a Rs 91.2 cr promoter loan with interest needed, and will pay and royalty be capped?
  5. What explains the creditors outstanding more than 180 days behind the GST order, and who are the three material creditors?

Opinion [Analyst View]. GK Energy is a real, fast-growing, audited business priced at 8.8x earnings, but the earnings are not yet converting to cash, the order book is falling against a doubling guide, almost all revenue is one government scheme, the module plant was dropped, and the founder's pay and royalty are growing faster than the profit. The price is cheap enough to follow and not yet proven enough to own. We want Q2 FY27 cash conversion and a notified PM-KUSUM 2.0 before committing, and the cause of the October fall remains unexplained.

Verdict:

TRACK

Sources

Merged from the seven research files. Access dates: the research run is dated 21 Oct 2026; Screener, Yahoo Finance and the company PDFs were fetched in that run; per-page access dates for the other secondary pages were not recorded and are not invented here. Document dates are given where known. Primary documents are marked [Primary].

Filings and company documents [Primary]

DocumentURLDate / note
Red Herring Prospectushttps://gkenergy.in/wp-content/uploads/2026/09/GK-Energy-RHP.pdfSep 2025 offer document; also HDFC Bank copy and BSE DRHP (Dec 2024) below
Annual Report FY2025-26 (standalone BS p.138, P&L p.139, notes pp.153-169; consolidated BS p.191)https://gkenergy.in/wp-content/uploads/2026/09/Annual-Report_FY_2025-26.pdfAuditor report signed 13 May 2026
Q1 FY27 investor presentationhttps://gkenergy.in/wp-content/uploads/2026/09/Investor-Presentation-Q1-FY-27.pdfAug 2026
Transcript Q2 FY26 callhttps://gkenergy.in/wp-content/uploads/2026/10/Transcript-of-Earning-Call-for-results-of-September-30-2025.pdf20 Nov 2025; also NSE https://nsearchives.nseindia.com/corporate/GKENERGY_22112025201916_Submission_transcript_Q2.pdf and BSE .../AttachHis/05df882a-a855-4b3f-bbc2-1c283d860b0a.pdf
Transcript Q4 FY26 callhttps://gkenergy.in/wp-content/uploads/2026/10/Transcript-of-Earning-Call-for-Results-of-March-31-2026.pdf13 May 2026; BSE https://www.bseindia.com/xml-data/corpfiling/AttachHis/fa6694eb-e11b-46f9-9336-b12d492b86c0.pdf
Transcript Q1 FY27 callhttps://gkenergy.in/wp-content/uploads/2026/10/Transcript-of-Earning-Call-for-Results-of-June-30-2026.pdf7 Aug 2026 (filed 13 Aug; company-hosted list also https://gkenergy.in/investors/investor-presentations-earnings-calls/earnings-call-transcripts/)
Shareholding pattern Sep 2026https://gkenergy.in/wp-content/uploads/2026/10/Shareholding-Pattern-September-2026.pdfSep 2026 quarter
Related Party Transactions policy / half-yearlyhttps://gkenergy.in/wp-content/uploads/2026/09/Related-Party-Transactions.pdfRead partially
GST search initiation intimationhttps://gkenergy.in/wp-content/uploads/2026/10/Intimation-of-the-initiatation-of-the-Search-Proceedings.pdf27 Feb 2026
GST search conclusion intimationhttps://gkenergy.in/wp-content/uploads/2026/10/Intimation-of-the-Conclusion-of-the-search-proceedings.pdfOrder disclosed 5 Mar 2026
Iyengar resignation intimationhttps://gkenergy.in/wp-content/uploads/2026/10/Intimation-of-the-resignaiton-of-the-Ms.-Chandera-Iyengar.pdf26 Feb 2026
Company filing index pageshttps://gkenergy.in/investors/stock-exchange-disclosures/ ; /annual-reports/ ; /investor-presentations-earnings-calls/n/a
Board of Directors pagehttps://gkenergy.in/investors/corporate-governance/board-of-directors/Oct 2026
DRHP (BSE)https://www.bseindia.com/corporates/download/337534/IPO%20Prior/GKENERGYDRHP_20241214173549.pdfDec 2024 (403 to our tools)
RHP (HDFC Bank copy)https://www.hdfc.bank.in/content/dam/hdfcbankpws/in/en/personal-banking/discover-products/wholesale-banking/investment-banking/offer-documents/accordion-pdf/GK-Energy-Limited-Red-Herring-Prospectus.pdfn/a
AGM notice (NSE)https://nsearchives.nseindia.com/corporate/GKENERGY_08082026182848_Notice_of_AGM_sd.pdf8 Aug 2026
Record date filing (NSE)https://nsearchives.nseindia.com/corporate/GKENERGY_07082026122209_Record_Date_sd.pdf7 Aug 2026

Ratings [Primary]

SourceURLDate
ICRA rating rationalehttps://www.icra.in/Rating/GetRationalReportFilePdf?id=138925 (also https://www.icra.in/Rating/ShowRationalReportFilePdf/138925)12 Nov 2025 (letter 11 Nov)
CARE press releasehttps://www.careratings.com/upload/CompanyFiles/PR/202602130200_GK_Energy_Limited.pdf5 Feb 2026
Infomerics press releasehttps://www.infomerics.com/admin/uploads/pr-GK-Energy-20may25.pdf20 May 2025; upgrade 12 Dec 2025

Market data and financial databases

SourceURLNote
Screener GK Energy (consolidated)https://www.screener.in/company/GKENERGY/consolidated/Fetched 21 Oct 2026, ~2:50 pm IST
Screener peershttps://www.screener.in/company/SHAKTIPUMP/consolidated/ ; https://www.screener.in/company/OSWALPUMPS/consolidated/ ; https://www.screener.in/company/WAAREERTL/consolidated/ ; https://www.screener.in/company/SAATVIKGL/consolidated/Fetched 21 Oct 2026
Yahoo Finance chart API (GKENERGY.NS, SHAKTIPUMP.NS, OSWALPUMPS.NS)https://query1.finance.yahoo.com/v8/finance/chart/GKENERGY.NS?range=3mo&interval=1d21 Oct 2026; not exchange-official
Fyers (bulk deal listing day)https://fyers.in/stocks/gk-energy-ltdSecondary source, 26 Sep 2025 trade
Tickertapehttps://www.tickertape.in/stocks/gk-energy-GKEn/a
Anand Rathihttps://anandrathi.com/stocks/gk-energy-ltd ; https://anandrathi.com/stocks/gk-energy-ltd/board-of-directorsn/a
5paisahttps://www.5paisa.com/marathi/stocks/gkenergy-share-price ; https://www.5paisa.com/news/gk-energy-sales-ipo-listingn/a
Upstox / Angel One shareholdinghttps://upstox.com/stocks/gk-energy-limited-shareholding/ ; https://www.angelone.in/stocks/gk-energy-ltd/shareholdingn/a
Sharekhan stock pagehttps://www.sharekhan.com/stock/gk-energy-ltdMF holders, poll
Trendlyne researchhttps://trendlyne.com/research-reports/stock/3262882/GKENERGY/gk-energy-ltd/3 IPO notes only
Stockopediahttps://www.stockopedia.com/share-prices/gk-energy-NSI:GKENERGYNo targets
MarketsMOJOhttps://www.marketsmojo.com/news/stock-recommendation/gk-energy-ltd-is-rated-buy-by-marketsmojo-4191024 ; .../marketsmojo-downgrades-gk-energy-ltd-to-hold-amid-mixed-technical-and-financial-signals-4118773 ; https://marketsmojo.motilaloswal.com/stocks-analysis/gk-energy-10039771-0 ; Q4 FY26: https://www.marketsmojo.com/news/result-analysis/gk-energy-q4-fy26-strong-revenue-growth-masks-margin-pressures-399001631 Aug, 23 Jul 2026
Business Standard resultshttps://www.business-standard.com/companies/quarterly-results/gk-energy-ltd-quarterly-results-94284n/a
Multibagghttps://www.multibagg.ai/market-pulse/articles/gk-energy-q1fy27-results-dividend-cmsiofhv5az0n0zp780t84lwm ; https://www.multibagg.ai/market-pulse/articles/gk-energy-q1-97442Q1 FY27
Kotak Neohttps://www.kotakneo.com/news/stocks/gk-energy-q1-fy-2026-27-results-net-profit-rises/ ; https://www.kotakneo.com/news/stocks/gk-energy-share-price-jumps-rooftop-solar-order/n/a
Univesthttps://univest.in/blogs/gk-energy-q4-fy26-fy26-revenue-up-40-percent-pat-up-51-percent-asset-light-model ; https://univest.in/blogs/gk-energy-share-price-target-2027-2028-2030Blog, not broker

IPO coverage and brokers

SourceURL
INDmoney IPO reviewhttps://www.indmoney.com/blog/ipo/gk-energy-ipo-review
Chittorgarhhttps://www.chittorgarh.com/ipo_review/gk-energy-ipo/4728/
Growwhttps://groww.in/ipo/gk-energy-ipo
Equentishttps://www.equentis.com/ipos/gk-energy-ipo_94284
Outlook Money (RHP key details)https://www.outlookmoney.com/invest/gk-energy-ipo-gmp-solar-epc-services-providers-public-issue-set-to-open-tomorrow-know-key-details-from-rhp
HDFC Skyhttps://hdfcsky.com/news/gk-energy-ipo-opens-tomorrow-key-details-financials-strengths-and-risks ; https://hdfcsky.com/news/shakti-pumps-invests-rs-10-crore-in-solar-subsidiary-shares-fall-0-34-percent
DSIJhttps://insights.dsij.in/dsijarticledetail/gk-energys-ipo-riding-the-pm-kusum-solar-pump-wave-should-you-subscribe-id015-52617
Geojithttps://blog.geojit.com/gk-energy-ipo-expanding-in-solar-and-water-infrastructure/
SP Tulsianhttps://www.sptulsian.com/f/ipo-analysis/gk-energy
StockAxishttps://stockaxis.com/IPO/GK-Energy-Limited-190925021933.html
Mercom (89.62x)https://www.mercomindia.com/gk-energys-ipo-closes-with-89-62-times-oversubscription
Business Standard (IPO, anchors)https://www.business-standard.com/amp/markets/ipo/gk-energy-s-464-crore-ipo-gets-89-62-times-subscription-by-final-day-125092301123_1.html ; https://www.business-standard.com/markets/ipo/gk-energy-raises-139-27-crore-from-anchor-investors-ahead-of-ipo-125091801322_1.html
Goodreturnshttps://www.goodreturns.in/news/gk-energy-ipo-day-3-subscribed-56x-gmp-hints-at-20-listing-gains-brokerages-recommend-subscribe-1458581.html ; https://www.goodreturns.in/ipo/gk-energy-raises-rs-100-cr-in-pre-ipo-round-from-valuequest-360-one-and-kotak-funds-ahead-of-rs-500-1453381.html
PR Newswire (DRHP addendum)https://www.prnewswire.com/in/news-releases/gk-energy-limited-files-addendum-to-drhp-amidst-strong-financial-growth-302448514.html
Energetica (DRHP addendum)https://www.energetica-india.net/news/gk-energy-ltd-files-addendum-to-drhp-amidst-robust-financial-performance
SolarQuarter pre-IPOhttps://solarquarter.com/2025/09/02/gk-energy-raises-%e2%82%b9100-crore-in-pre-ipo-round-at-%e2%82%b93100-crore-valuation/
Techleap (promoter sale)https://finder.techleap.nl/news/feed/gk-energy-promoters-sell-stake-for-rs-64-3-cr
TipRanks (price movement clarification)https://www.tipranks.com/news/company-announcements/gk-energy-limited-clarifies-share-price-movement (24 Oct 2025)
ScanX (anchor lock-in; committees; resignation; GST)https://scanx.trade/stock-market-news/stocks/gk-energy-and-saatvik-green-energy-anchor-lock-ins-end-today-both-trading-below-ipo-prices/28133282 ; https://scanx.trade/stock-market-news/companies/gk-energy-limited-reconstitutes-board-committees-with-new-leadership-structure/35039309 ; https://scanx.trade/stock-market-news/stocks/gk-energy-limited-announces-resignation-of-independent-director-mrs-chandra-iyengar/33750080 ; https://scanx.trade/stock-market-news/stocks/tax-authorities-initiate-search-operations-at-gk-energy/33751111 ; https://scanx.trade/stock-news/gk-energy-ltd
StudyCafe (GST search)https://studycafe.in/gst-dept-conducts-search-operation-at-registered-office-of-gk-energy-disallows-itc-on-ipo-expenses-and-other-claims-412318.html
MarketScreener (Kabra)https://it.marketscreener.com/insider/GOPAL-RAJARAM-KABRA-A3X7WA/
Kalkinehttps://www.kalkine.co.in/article/growth/gk-energy-stock-analysis-solar-water-pump-epc-riding-the-pm-kusum-tailwind-at-14x-earnings ; https://www.kalkine.co.in/article/announcements/gk-energy-nsegkenergy-what-did-the-board-decide-at-its-august-2026-meeting

Concall, results and order news

SourceURL
Arthneetihttps://www.arthneeti.com/insights/gk-energy-q1-fy27-earnings ; https://www.arthneeti.com/insights/gk-energy-q2-fy26-earnings ; https://www.arthneeti.com/insights/gk-energy-q3-fy26-earnings ; https://www.arthneeti.com/insights/gk-energy-q4-fy26-earnings ; https://www.arthneeti.com/stocks/gk-energy/concall/q4-fy26-earnings-call-analysis ; https://www.arthneeti.com/stocks/gk-energy/concall/q2-fy26-earnings-call-analysis
Energetica Indiahttps://energetica-india.net/news/gk-energy-crosses-726-mw-installed-capacity-as-q1-revenue-climbs-71-percent ; https://www.energetica-india.net/news/gk-energy-reports-40-percent-revenue-growth-in-fy26-to-inr-1532-cr-pat-up-by-51-percent
PV Magazine India (FY26 release)https://www.pv-magazine-india.com/press-releases/gk-energy-delivers-40-revenue-51-pat-growth-in-fy26-through-asset-light-renewable-energy-model/
SolarQuarterhttps://solarquarter.com/2025/11/07/gk-energy-to-procure-875-mw-of-dcr-solar-pv-cells-to-strengthen-indias-domestic-manufacturing-push/ ; https://solarquarter.com/2025/11/17/gk-energy-reports-strong-h1fy26-performance-with-50-growth-in-solar-pump-installations/ ; https://solarquarter.com/2026/08/07/gk-energy-reports-inr-505-19-crore-q1-fy2026-27-revenue-pat-surges-61-55-to-inr-59-67-crore/ ; https://solarquarter.com/2026/09/21/gk-energy-secures-150-mw-300-mwh-bess-award-from-msedcl/
Saur Energy (Q2 FY26)https://www.saurenergy.com/solar-energy-news/gk-energy-posts-404-crore-q2-revenue-fy26-10781466
Renewable Watchhttps://renewablewatch.in/2026/07/06/gk-energy-bags-10000-solar-pumps-order-from-msedcl/ ; https://renewablewatch.in/2026/07/07/shakti-pumps-and-oswal-pumps-secure-solar-pump-orders-from-msedcl/
Upstox newshttps://upstox.com/news/market-news/stocks/gk-energy-shares-in-focus-as-firm-wins-455-crore-solar-project-check-details-of-second-order-in-a-week/article-199379/
SAHIhttps://www.sahi.com/news/gk-energy-receives-approval-for-100-mw-rooftop-solar-project-worth-454-50-crores-4674369-PE1_ ; https://www.sahi.com/news/gk-energy-reports-q1-revenue-of-500-crore-vs-320-crore-yoy-4674369-PE1_ ; https://www.sahi.com/news/gk-energy-bags-10-mw-project-worth-48-02-cr-eyes-3-000-cr-fy27-revenue-4674369-PE1_ ; https://www.sahi.com/news/gk-energy-receives-msedcl-award-for-150-mw-battery-storage-with-42-84-crore-annual-revenue ; https://www.sahi.com/news/gk-energy-receives-msedcl-loa-for-150-mw-300-mwh-battery-storage-with-vgf-support ; https://www.sahi.com/news/gk-energy-to-hold-meetings-with-several-analysts-and-investors-on-august-26-4674369-PE1_ ; https://www.sahi.com/news/shakti-pumps-reports-37-9-revenue-growth-to-859-crore-in-q1-fy27-2472-PE1_COR
Angel One (order)https://www.angelone.in/news/stocks/gk-energy-shares-surges-over-3-secures-235-92-crore-order-for-10-000-solar-water-pumping-systems
Business Standard (Q2 FY26; LoE amendment)https://www.business-standard.com/amp/markets/capital-market-news/gk-energy-rises-after-q2-pat-jumps-36-yoy-to-rs-46-5-crore-125111700317_1.html ; https://www.business-standard.com/amp/markets/news/gk-energy-shares-jump-5pc-on-receiving-loe-amendment-for-solar-pumps-125122400439_1.html
Tickertape / Capital Market (Q2 FY26)https://www.tickertape.in/stocks/gk-energy-GKE
Arihant Capital (MSEDCL amended empanelment)https://www.arihantcapital.com/company-information/companynewsdetails/24358010061

Industry, policy and peers

SourceURL
SolarQuarter: PM-KUSUM deadlines extended, 2.0 planned (6 Apr 2026)https://solarquarter.com/2026/04/06/pm-kusum-project-deadlines-extended-amid-financing-challenges-transition-to-kusum-2-0-planned/
CSE: Redesigning PM-KUSUM 2.0https://www.cseindia.org/redesigning-pm-kusum-2-0-13294
Business Today: Budget 2026 PM-KUSUM 2.0https://www.businesstoday.in/amp/union-budget/story/budget-2026-may-roll-out-pm-kusum-20-with-nearly-45-funding-hike-to-deepen-farm-solarisation-513437-2026-01-29
Business Today: Shakti / Oswal Q1 preview (Choice)https://www.businesstoday.in/amp/markets/stocks/story/shakti-pumps-oswal-pumps-target-prices-q1-preview-key-trigger-for-solar-pump-stocks-540399-2026-07-02
Drishti IAS: deadline to March 2027https://www.drishtiias.com/state-pcs-current-affairs/pm-kusum-scheme-deadline-extended-to-march-2027/print_manually
PEDA PM-KUSUMhttps://www.peda.gov.in/pm-kusum
PM-KUSUM official FAQhttps://pmkusum.mnre.gov.in/landing-faq.html
ALMM List-II cells from June 2026https://solarquarter.com/2025/07/29/mnre-issues-amendment-mandating-almm-compliance-for-solar-pv-cells-from-june-2026/amp/
IMARC India solar water pump markethttps://www.imarcgroup.com/report/en/india-solar-water-pump-market
SolarQuarter: Sahaj Solar and Alpex Solar ordershttps://solarquarter.com/2026/04/30/sahaj-solar-secures-%e2%82%b963-5-crore-contract-for-solar-pumps-under-pm-kusum-scheme-in-maharashtra/ ; https://solarquarter.com/2026/04/23/alpex-solar-secures-%E2%82%B940-92-crore-msedcl-order-for-solar-pumping-project-in-maharashtra/
PV Magazine India (Oswal Rs 380 cr order)https://www.pv-magazine-india.com/?p=13886
Investywise (Oswal Q1 FY27)https://www.investywise.com/?p=108436
Sahi (Shakti Q1 FY27)https://www.sahi.com/news/shakti-pumps-reports-37-9-revenue-growth-to-859-crore-in-q1-fy27-2472-PE1_COR

Not Available and where it was searched

ItemWhere searchedStatus
Official NSE/BSE close for 21 Oct 2026; NSE/BSE bulk and block deal archivesNSE and BSE sites (HTTP 403, Akamai)Not Available; Yahoo NSE series used as proxy for price. Only bulk deal found is 26 Sep 2025 (secondary source)
Why the stock fell in October; 20 Oct row missing in the Yahoo seriesExchange disclosure page, Yahoo, news searches, ScreenerNot Available: cause unexplained; no company-specific October filing; 20 Oct reason not checked
PM-KUSUM 2.0 notification status at 21 OctNews searches, MNRE/PIB, exchange filingsNot Available: no announcement found
Standalone audited statements PDF (Financial-Statement-2025-26.pdf)gkenergy.inImage-only; Annual Report text used instead
Q2 FY26 / Q1 FY27 quarterly balance sheets; Jun-26 net cashCompany decksNot read; Not Available
Names of Supplier A / C / D / E, 3 material creditors, 875 MW cell supplierRHP, AR, company websiteWithheld or not on files read
RHP sections: restated cash-flow detail, statutory-dues delay amounts, capital-structure history, previous auditor and any changeRHPNot read in full
10-year revenue CAGR 66% (AR) vs 5-year 116% (deck)AR, deckInconsistent bases, not reconciled
Q2 FY27 result dateExchange board-meeting intimationsNot found; expected mid-Nov 2026
Sell-side targets, consensus, FY+1 / FY+2 estimatesTrendlyne, Screener, Sharekhan, Stockopedia, aggregatorsNone exists
Forums and social (Reddit, X, ValuePickr, Morningstar)Search quota exhaustedNot retrieved; check valuepickr.com, r/IndianStockMarket, X cashtag $GKENERGY
Smaller PDFs: Q4 FY26 / Q3 FY26 decks, ICRA / Infomerics letters, AGM notice (remuneration resolutions), MSEDCL Letter of Empanelment (5 Jul 2026), orders of 2 Jul 2026gkenergy.inNot opened
GST appeal status; GST rate on solar pumps/modulesFilings, newsNot Available
Top-5 / top-10 customers (RHP basis); module-plant acreage; FY22 financials; Q1 FY25; ESOP (none per RHP)RHP, Screener, filingsNot Available
CFO and CS prior employers; SAST Reg. 29 details (committee compositions were found in the AR during QC and are in Tab 7)Company site, filingsNot Available
Index membership (Nifty / BSE indices)Seven research filesNot Available
Depth statement. This is a listed mainboard company (26 Sep 2025 IPO) with thin disclosure on several fronts (no sell-side coverage, no segment reporting, undisclosed supplier names, blocked exchange archives). Every material fact from the seven input files has been carried over at full granularity; where the files conflicted, the primary-document gap-fill governs and the conflicts are noted in place.